40Ar/39Ar Geochronology of Gold Mineralisation in Central Victoria û Results and Problems

The Australasian Institute of Mining and Metallurgy
D Phillips
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
3
File Size:
42 KB
Publication Date:
Jan 1, 2008

Abstract

One of great challenges is to determine the exact timing of gold mineralisation in centralVictoria due to suitable materials and/or geochronological techniques. Here we report new mica and pyrite 40Ar/39Ar age data by laser probe and step-heating furnace analyses, and discuss problems in data collection and interpretation. An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.
Citation

APA: D Phillips  (2008)  40Ar/39Ar Geochronology of Gold Mineralisation in Central Victoria û Results and Problems

MLA: D Phillips 40Ar/39Ar Geochronology of Gold Mineralisation in Central Victoria û Results and Problems. The Australasian Institute of Mining and Metallurgy, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account