The Kuparuk River Central Channel Bridge on the North Slope of Alaska provides critical access for oilfield service vehicles in the largest oilfield in the United States. The original sloped spill-through bridge abutments were protected by articulated concrete revetment. After 27 years of heavy service, ice impact, deep river scour, and high floods, the revetment required replacement. An OPEN CELL SHEET PILE® abutment was selected to replace the existing erosion protection and provide increased performance and structure life. Project engineers and contractors successfully addressed the challenges of low overhead sheet pile installation under the bridge, extremely heavy vehicle loads, and arctic winter construction conditions through innovative design and construction techniques. The project was successfully completed on schedule with minimal disruptions to critical bridge traffic. This paper provides a detailed discussion of the design and construction techniques utilized to address the challenges of the project, many of which could be adapted to other projects.
Citation

APA: Dempsey S. Thieman  (2008)  Design And Construction Of Open Cell Sheet Pile® Abutments Under An Existing Bridge

MLA: Dempsey S. Thieman Design And Construction Of Open Cell Sheet Pile® Abutments Under An Existing Bridge. Deep Foundations Institute, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account