Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Flow Control in Tunnels - NAT2022
By Darold Woodward, Stefan Haydn, Petr Pospisil
Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu
Dec 1, 2022
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021
By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021
By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021
By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021
By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022
By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021
By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021
By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021
By Arash Dahi Taleghani, Pooyan Asadollahi
Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr
Jun 13, 2021
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022
By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022
By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021
By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Advance Rates in Soft Ground Tunnelling - RETC2021
By Dan Ifrim
Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021
By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Updating the GBR Gold Book - NAT2022
By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022
By Jeremy Stone, Yiming Sun, John Stolz
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc
Dec 1, 2022
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021
By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad Corridor
By Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau
Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r
Jun 13, 2021
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022
By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Best Practice for Comprehensive Condition Assessments of Remote Tunnels - RETC2021
By Herman Gill, Dani Delaloye, Madelyn Rubin
The Foothill Tunnel is a remote 16-mile-long untreated drinking water tunnel in the San Francisco Public Utilities Commission’s (SFPUC) Hetch Hetchy Water and Power (HHWP) system. The 14-foot horsesho
Jun 13, 2021