TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

Society for Mining, Metallurgy & Exploration
Francesco Chiappalone Fabrizio Fara Franco Gasperin Marco Invernizzi
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
429 KB
Publication Date:
Jun 23, 2024

Abstract

As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeological conditions, the tunnel is excavated maintaining a ground support pressure between 1 and 3 bar imposing significant challenges to the projects. The first part of the paper describes the general characteristics of the project while the second part focuses on the challenges and technical details of the pressurized breakthrough that took place in a deep shaft excavated in urban environment as part of the project.
Citation

APA: Francesco Chiappalone Fabrizio Fara Franco Gasperin Marco Invernizzi  (2024)  TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

MLA: Francesco Chiappalone Fabrizio Fara Franco Gasperin Marco Invernizzi TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account