Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
PCBs In Underground Mines: EPA/MSHA Enforcement InitiativeBy C. D. Secrest
Visiting Spring Canyon, a historic coal mining district near Helper, Utah, I was impressed by the great accomplishments that had taken place there. A tour book of the region tells of a period that beg
Jan 1, 1993
-
PDAC 2011; More Than 22,000 Expected At Annual ConferenceBy Steve Kral
The Prospectors and Developers Association of Canada (PDAC) was established in 1932 in response to proposed regulations that would have threatened prospectors in Ontario. From there, the association
Jan 1, 2011
-
PDAC attracts more than 25,000 People; Canadian Government shows its Support for MiningBy William Gleason
"Government support for Canada’s mineral industry was on full display during the Prospectors & Developers Association of Canada (PDAC) conference in Toronto, ON, Canada on March 3-6. First, there was
Apr 1, 2019
-
Peabody Coal Company?s ?River King Mine?By W. A. Weimer
Coal and coal mining is no longer the mighty king of industry and in our daily lives and homes that it once had the privilege of commanding. Many of you will remember that one of the chores of your yo
Jan 1, 1961
-
Peabody Western Coal Cuts Costs With Bottom-Dump HaulersBy Silvano Perla
Peabody Western Coal Co. operates two mines in northern Arizona. The Black Mesa and Kayenta coal mines are unique for several reasons. They both have only two customers: Southern California Edison
Jan 1, 1995
-
Peabody's Camoy System - "True Continuous Coal Mining" - SummaryBy J. A. L. Campbell
Peabody's Camoy mining system is a truly continuous conceptual method of underground mining of coal. The system solves the three factors which limit coal from being mined continuously. Camoy&apos
Jan 1, 1976
-
Peabody's Perspective On The First Year With Osm Implications For The FutureBy James R. Jones
It has been 2-1/2 years since the Congress passed the Surface Mining Control and Reclamation Act of 1977 (PL95-87) the Office of Surface Mining every deadline specified in the Act. Hopefully the Congr
Jan 1, 1980
-
Peak Particle Velocity Doesn't Cut ItBy G. R. Coonan
A number of famous studies have shown that house damage relates better to peak particle velocity than to acceleration or displacement. The relationship is true but doesn't go far enough. Why, for
Jan 1, 1980
-
Peak Torque Calculations for BackstopsBy Dr. -Ing. Karlheinz Timtner
This paper deals with the complicated and often misunderstood relationship between torsional windup, load sharing and peak torques in conveyor backstops. The principals apply in low speed, intermediat
Jan 1, 1996
-
Peat Exploration In Florida - 1.0 IntroductionBy T. M. Gurr
In recent years the need for reducing energy costs has led many in search of alternative fuels, examples are gasohol, "cow power", oil shale, biomass, peat and many others. We have been involved wit
Jan 1, 1983
-
Pebble Crushing in a SAG Mill CircuitBy D. E. Healy
In 1989, an autogenous grinding task force was formed to study potential autogenous grinding circuits to replace the existing semi-autogenous grinding (SAG) at the National Steel Pellet Plant in Keewa
Jan 1, 1992
-
Pebble Crushing Practice at Cyprus BagdadBy Bruce Clements
The Bagdad mill, located near Bagdad, AZ, was built in 1977 with a designed mill capacity of 36.3 kt/d (40,000 stpd). An autogenous mill-ball mill crusher (ABC) grinding circuit was chosen. The or
Jan 1, 1992
-
Pebble Crushing Practice At Cyprus Bagdad (189ef622-ccff-4645-a972-8a4fa683e0a8)The Bagdad mill, built in 1977, was de-signed for a mill capacity of 36,300 tpd. An ABC (Autogenous Mill-Ball Mill-Crusher) grinding circuit was chosen. The original mill contained three completely in
Jan 1, 1992
-
Pebble Crushing Test In A Sag Mill CircuitBy D. E. Healy
In 1989 an Autogenous Grinding Task Force was formed to study potential autogenous grinding circuits to replace the existing semi-autogenous grinding at the National Steel Pellet Plant located in Keew
Jan 1, 1992
-
Pebble Grinding At Bethlehem Copper Corporation Ltd. ? IntroductionBy C. W. Overton
The operations of Bethlehem Copper are situated in the south-central interior of British Colombia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through A
Jan 1, 1973
-
Pebble Grinding At Granduc?s Tide Lake ConcentratorBy W. C. Hellyer
The Granduc ore body is located beneath glacial terrain on the borders of British Columbia and Alaska, some 600 miles from Vancouver and 30 miles from Tidewater at Stewart, B. C. The concentrator and
Jan 1, 1972
-
Pebble Lime From Preheater KilnsBy J. L. Thompson
Lime made in a coal-fired, rotary kiln has two distinct parts: the interior of the pebble which constitutes about 90% to 95% of the mass, and the surface dust layer which is the remaining 5% to 10%. U
Jan 1, 1978
-
Pebble Project Moves Forward After Election VictoryIn Alaska?s southwest corner, in the Bristol Bay region, 476 holes have been drilled to help define the size of the Pebble Project. The results indicate that the deposit holds close to 32 Mt (72 billi
Jan 1, 2009
-
Pebbles MillsBy B. S. Crocker
Introduction Pebble mill grinding can be defined as wet or dry grinding in a tumbling mill with pebbles used as grinding media instead of metal balls. To clarify the terminology, which may differ i
Jan 1, 1985
-
Peer-Reviewed Abstracts from the 2014 Student Poster Contest"Foreword by Emily SarverAssistant professor, Mining and Minerals Engineering, Virginia Tech, Blacksburg, VAThe Mineral Processing Division hosted its fifth Student Poster Contest during the 2014 SME
Jan 1, 2015