PC-Based Worker-Scheduling System For Underground Mines

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 5
- File Size:
- 355 KB
- Publication Date:
- Jan 1, 1998
Abstract
As a followup to a USBM-sponsored research project, the authors utilized the knowledge-base structure and system concepts from a Sun Sparcstation-based worker-scheduling system of the mine-management support system to develop a PC-based application. The new software adopts the nested-window concept to facilitate data collection and modification on personnel, including their availability and work priorities during a shift. The system can optimally allocate manpower on a work shift and can delineate supervisory training responsibilities. The various components of the software, including enhancements made to the original system, are described in detail.
Citation
APA:
(1998) PC-Based Worker-Scheduling System For Underground MinesMLA: PC-Based Worker-Scheduling System For Underground Mines. Society for Mining, Metallurgy & Exploration, 1998.