Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    The Fundamental Relationship Between Sample Mass and Sampling Variance in Real Geological Samples and Corresponding Statistical Models

    "In mineral exploration and mining applications, it is sometimes necessary to reduce sampling error in order to improve representivity of individual sample assays. Historic efforts to reduce sampling

    Jan 1, 2007

  • CIM
    Modeling of the Direct-to-Copper Flash Smelting Process

    By M. Kucharski

    The model of the Outokumpu direct-to-copper process deals with a steady-state process the parameters of which do not depend on time. To give a prediction for the process outcome, "a modified black box

    Jan 1, 2007

  • CIM
    Electrorefining High Level Arsenic Cast Anode

    By . A. C. Atenas

    Control of arsenic in the Potrerillos' Refinery electrolyte has been obtained by withdrawing a bleed stream of circulating electrolyte and ensuring the ratio of [O]/[As] in the cast anodes is mai

    Jan 1, 2007

  • CIM
    The Impact of Emerging Markets on Copper Supply and Demand - The Case of India and China

    In recent years, China and India have emerged as major players in the copper sector. Over the last decade, around 50% of additional global refined copper usage growth can be attributed to them. The pa

    Jan 1, 2007

  • CIM
    Optimization of the Froth Washing System of Columns in the Rougher Circuit of the Miduk Copper Concentrator

    By M. Massinaei

    Recently constructed circuits have included multiple stages of columns in a variety of applications, from roughing to cleaning. The Miduk copper concentrator (in south-eastern Iran) is one of the uniq

    Jan 1, 2007

  • CIM
    Influence of Friction Stir Welding on the Tensile Behavior of AZ31B Magnesium Alloy

    By N. Afrin

    The microstructure and tensile properties of AZ31B-H24 magnesium (Mg) alloy after friction stir welding (FSW) were evaluated. The grain size was observed to increase from approximately 5 µm to about 9

    Jan 1, 2007

  • CIM
    Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess Mine

    By Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam

    "The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c

    Jan 1, 2007

  • CIM
    Technology Development in the Copper Industry

    By J. O. Marsden

    Over the past decade, the copper industry has been through an extended downturn followed by several years of sustained high copper price. A number of new technologies have been developed over the past

    Jan 1, 2007

  • CIM
    Acid Generation by In-Situ Sulfur Biooxidation for Copper Heap Leaching

    By P. G. West-Sells

    At Barrick's Zaldivar Copper Mine in Chile, the addition of sulfuric acid to the ore going to heap leaching is a major expense. A process in which a portion of this acid is replaced by elemental

    Jan 1, 2007

  • CIM
    The Oxidative Leacidng of a Copper Sulphide Intermediate Product

    By J. M. Shneerson

    Gipronickel Institute, Saint-Petersburg will The copper concentrate was extracted from copper and nickel matte after its hydrometallurgical treatment and nickel removal. The concentrate containing 60-

    Jan 1, 2007

  • CIM
    Understanding Vessel Integrity: A Study Of The Thermo-Mechanical Behaviour Of Refractory Lining Segments

    By T. Prietl

    Metallurgical vessel linings are multilayered, consisting of refractory bodies, insulation materials, joints, and additional space to control for thermal expansion. A unique biaxial hot testing press

    Jan 1, 2007

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    A Thermo-Chemical Model of the Peirce - Smith Copper Converter: Part I. Slag Making Stage

    By M. Aushouri, S. H. Mansouri, N. Aminizadeh

    A thermo-chemical model of the Peirce-Smith copper converter has been developed to predict the molten temperature. The primary assumption of the model was that all matte, slag and gaseous phases in th

    Jan 1, 2007

  • CIM
    Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling Equipment

    By M. J. Marinigh

    Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re

    Jan 1, 2007

  • CIM
    Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project

    By David Meadows, John Starkey

    "As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s

    Jan 1, 2007

  • CIM
    Noranda Process Reactor at Xstrata Copper- Impact of Minor Slag Components (CaO, Al2O3, MgO, ZnO) on the Optimum %Fe/SiO2 in Slag and Operating Temperature

    By P. Coursol

    The Noranda Reactor Process (NRP) has been in operation now for more than 30 years and this mature process has attained a high level of performance. The NRP at the Home Smelter of Xstrata Copper treat

    Jan 1, 2007

  • CIM
    Monitoring The Influence Of Additives On Deposit Morphology During Copper Electrorefining Using Electrochemical Noise Technique

    The copper electrodeposition from sulphuric acid electrolytes in the presence of Thiourea and Gelatin as additives was investigated by electrochemical noise and cyclic voltammetry in conjunction with

    Jan 1, 2007

  • CIM
    Modernization and Start-Up of the Spcc Ilo Smelter

    By W. Torres Pino, L. Mariscal Samaniego

    The Ilo Smelter has been continuously operating since 1960 with Reverberatory furnaces and Pierce Smith converters producing blister copper. The original installed capacity of 1.134 tons per day of co

    Jan 1, 2007

  • CIM
    Sustainable Development And Self-Organization

    By F. Flores

    With the World Summit for Sustainable Development planned for 2002 in mind, nine of the world's largest mining companies decided to initiate a project to examine the role of the minerals sector i

    Jan 1, 2007

  • CIM
    Creep Properties of an Over-Aged Al2024 Composite Reinforced with SIC Particles Prepared by Hot Powder Extrusion

    By N. Bakhshizadeh

    In this investigation, the aging effect on creep behavior of A12024-10%SiC composite fabricated by powder metallurgy was studied. P/M bars were manufactured by hot powder extrusion method at 450°C wit

    Jan 1, 2007