Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    CSR: Evolution To Survive In A Developing World

    By Mark B. Thorpe

    Golden Star Resources started gold mining operations in Africa in 1999 after 15 years of exploration in South America. At the time, the approach to local assistance was through "alternative livelihood

    May 1, 2011

  • CIM
    Implications of Trends in Base Metals and Gold Financing, and Acquisitions Activity

    By Michael Chender

    Emerging Equity Sources ? Larger IPOs ? China Inc. ? Other sovereign wealth funds ? New funds and higher allocations ? Private equity

    May 1, 2010

  • CIM
    ONSET OF A BOTTLENECK ? The Permitting and Regulation of New Mining Projects - The Western Canadian Experience

    What Bottleneck? ??Resurgence of BC Mining Industry; ??Climate of heightened activity ?Increases pressure placed upon regulatory agencies; ??Current EA and permitting system, when Federal agencies

    May 1, 2006

  • CIM
    Toward the Optimization of Flotation Column Operation (9284e55e-ecc3-4510-af19-44c99925dde0)

    By J. Bouchard, A. Desbiens, M. Maldonado, R. del Villar

    ABSTRACT: Despite many years of practical applications in mineral processing plants, the potential of column flotation has still not been fully exploited. The challenge in measuring some key variables

    Jan 1, 2011

  • CIM
    Microstructure and Mechanical Properties of Twin-Roll Cast Al-Mg Based Alloys

    By C. Y. Lim, H. W. Kim, M. S. Kim, J. H. Cho, Y. S. Lee

    Al - 5.5 wt% Mg - 0.3 wt% Cu alloy strip was successfully fabricated by horizontal-type twinroll casting (TRC). For producing sound strips with no surface defect, the casting was conducted at various

    Jan 1, 2014

  • CIM
    Concentrator Utilization under Geological Uncertainty

    By Alessandro Navarra, Kristian Waters

    Mineral concentrators are designed from preliminary geological data, and are therefore subject to geological uncertainty. This uncertainty has a demonstrable impact on the mining lifecycle, and has mo

    Jan 1, 2015

  • CIM
    Hard Automation Trends in Australian Underground Coal Mines

    By Stephen van Duin

    As productivity in coal extraction demands increase in underground coal mines, the industry is faced with finding new ways to support production without jeopardising safety. In modern mines the capaci

    Aug 1, 2013

  • CIM
    Development and Production of X80 Hot-Rolled Thick Steel Strips in WISCO

    By C. -S. Xie, J. -H. Kong

    The microstructure and mechanical properties of X80 hot-rolled thick steel strips with a thickness of 17.5mm produced in Wuhan Iron & Steel Company (WISCO) are introduced in the paper. The steel strip

    Jan 1, 2005

  • CIM
    An Innovative Process for the Separation of Iron in Mixed-Chloride Medium: A Case Study for Lateritic Ore

    By M. A. Halim, V. I. Lakshmanan, Z. Jankovic

    An innovative mixed-chloride process for the separation of iron from lateritic ore is described. The separation of Fe(III) from leach liquor is an important process step for the recovery of nickel and

    Jan 1, 2015

  • CIM
    Oxides Formed During the Dehydration of Magnesium Chloride Hexahydrate

    By S. Kashani-Nejad

    The formation of oxides during the dehydration of MgC12,6H20, Bischofite, was studied by heating the bischofite over a range of time and temperatures in ambient atmosphere. Using a methanol-leaching t

    Jan 1, 2006

  • CIM
    Co-Extraction of Coal and Methane

    The concept and practices of co-extraction of coal and methane have emerged in recent years to improve coal mining safety and productivity, utilise methane resources, and reduce fugitive emissions in

    Aug 1, 2013

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017

  • CIM
    Estimation and Reporting of Mineral Resources for Coarse Gold-bearing Veins

    By Simon C. Dominy, Ian M. Platten, Garry F. Johansen, Alwyn E. Annels, Brian W. Cuffley

    Abstract - Coarse gold-bearing veins are characterized by high grades that are localized and erratic. Effective sampling of coarse gold-bearing veins is difficult because of the low concentration and

    Jan 1, 2000

  • CIM
    Bioleaching of Pyrrhotite Tailings for Ni Extraction- Insights into an Adaptive Evolution Study

    By Cheryl Devine, Radhakrishnan Mahadevan, Vladimiros G. Papangelakis, Srinath Garg

    The microbial-mediated recovery of valuable metals locked in mining wastes presents an economical alternative to conventional hydrometallurgical processes. The present study investigated the bioleachi

    Jan 1, 2015

  • CIM
    Recovery of Hematite from HPAL Residue of Laterite Ore

    By G. Azimi, C. A. Ang, F. Zhang

    "Nickel recovery from laterite ores generates large amounts of solid and liquid wastes. This is primarily due to the low concentration of Ni (about 1.4 wt%) in the feed ore to the High-Pressure-Acid-L

    Jan 1, 2017

  • CIM
    Geology of the Key Lake deposits

    By Arthur L. de Carle

    "IntroductionThe Key Lake uranium-nickel deposits are located within a Mineral Lease centred at latitude 57 ° 12' north and longitude 105 °39' west along the southeastern rim of the Athabasca sediment

    Jan 1, 1986

  • CIM
    Electrical Generation and Operating Costs at Cassiar's Power Plant

    By A P. Powell

    This paper deals with the power plant at Cassiar Asbestos Corporation Ltd., Cassiar, B.C. It discusses the units installed in the plant, the distribution of power and the costs involved. The efficienc

    Jan 1, 1965

  • CIM
    Novel Technology Provides for on-Line Measurement of Particle Size in Individual Cyclones

    By J. Poplawski

    In mineral processing plants, cyclones typically perform the classification duty prior to the downstream recovery process. Particle size distribution of the cyclone overflow is an important parameter

    Jan 1, 2019

  • CIM
    Separation of Arsenic and Recovery of Antimony and Tin from Silicate Slag in a Nonferrous Smelter

    By A. Iizuka

    This study was aimed at separating and recovering arsenic, antimony, and tin from refining byproducts generated in a nonferrous smelter. The target byproduct was a silicate slag containing the above e

    Jan 1, 2019

  • CIM
    Rio Tinto Oyu Tolgoi Mine, Mongolia Mine Conveyance Safety Fall Arrest System for #1 Shaft

    By Andre du Preez

    Emergency Fall Arrest System Rio Tinto?s Primary Objective: ?To achieve repeatable controlled safe deceleration rates during emergency fall arrest activation (Ontario OHSA Regulations) ?Must op

    May 1, 2013