  • SME
    Assessment Of Stable And Failed Pillars In Underground Limestone Mines

    Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na

    Jan 1, 2008

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • AUSIMM
    The Career of the Gold Dredge in New South Wales

    It is now five years since the advent of gold-dredging in Australia, the State of New South 'Wales, or colony as it was, being the first to adopt this system of gold-getting, and the credit of it

    Jan 1, 1904

  • NIOSH
    IC 9121 International Regulation Of Diesel Engine Use Underground: A Country-By-Country Synopsis

    By Robert W. Waytulonis

    Mining regulations pertaining to the use of diesel engines were solicited from foreign countries with mining operations by the Bureau of Mines. Responses were received from 27 countries; the informati

    Jan 1, 1987

  • NIOSH
    Bulletin 202 Electric Brass-Furnace Practice

    By H. W. Gillett, E. L. Mack

    Prior to 1911 the literature on melting brass by electricity consisted entirely-save for some suggestions made in patent literature but not actually worked out-of a few observations by farseeing men '

    Jan 1, 1922

  • IIMP
    Alineamiento láser en equipos de taladros largos

    By André Vela

    Este trabajo técnico describe el desarrollo de un sistema de alineamiento láser en un equipo Raptor 55-2R de la marca Resemin —utilizado en minería subterránea— con el objetivo de mejorar la precisión

    Dec 31, 2020

  • SAIMM
    Innovative And Safe Copper Launder Design

    By B. Leong, H. Joubert

    Keywords: Pyrometallurgy, furnace, auxiliary equipment, copper slag launders Pyromet has designed copper launders for tapping slag. What makes Pyromet?s launder design innovative and safe is that

    Jan 1, 2006

  • IIMP
    Introducción al intercambio ionico

    By Jaime Newell

    Actualmente la química de los iones ha adquirido una importancia preponderante en sus aplicaciones industriales, de forma que el presente artículo revisa las definiciones de la ionización y sus aplica

    Jan 1, 1959

  • NIOSH
    RI 5446 Reconnaissance Of Nevada Manganese Deposits - Summary

    By Russell R. Trengove

    The largest potential reserves of manganese in Nevada are in the Pioche district. To date, these large reserves of 10-to l2-percent manganese cannot be upgraded economically. Other large, low-grade de

    Jan 1, 1959

  • AUSIMM
    Experiences with Underground Sampling of Emplaced Hydraulic Fill

    The methods and equipment developed and used at the Mount Isa mine to obtain samples of uncemented hydraulic fill lying above major horizontal pillars are described. From existing underground developm

    Jan 1, 1976

  • SAIMM
    Impact of silica on hydrometallurgical and mechanical properties of RIP grade resins for uranium recovery ? Synopsis

    By V. Yahorava

    Resin-in-pulp (RIP) technology has recently often been considered for the direct recovery of base metals and uranium from dense pulps. Implementation of RIP will eliminate the requirement for any soli

    Jan 1, 2009

  • IIMP
    Uso de tecnologías limpias en la separación cu-pb por flotación

    By Benigno Ramos

    Dado que los minerales polimetálicos son de naturaleza compleja, su procesamiento técnico económico depende de la mineralogía de la mena y las propiedades físico-químicas de cada especie individual fr

    Jul 31, 2003

  • CIM
    The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport Pipelines

    By D. Wolfe, K. Reid, T. Nunn

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug

    Jan 1, 2014

  • IIMP
    Las evaluaciones médicas ocupacionales y la valoración médica de la aptitud para el trabajo

    By Raúl Gomero-Cuadro

    El presente texto describe la importancia de la salud ocupacional -en tanto adecúa la posición del empleo al trabajador. La evaluación comprende tres etapas: recolección de la información, análisis y

    Oct 1, 2016

  • AIME
    Rock Mechanics Studies In A Mechanized Longwall Coal Mine

    By Paul H. Lu

    Methods and results of measuring three basic parameters for ground stability control, ground pressure, strata movement, and geomechanical properties of mine rock are presented in this paper. It is fou

    Jan 1, 1984

  • AUSIMM
    Gippsland Basin Resources for Long Term Economic Prosperity

    It has long been recognised that Australia can benefit substantially in an economic sense from its rich resource base. The significant resources of the Gippsland Basin are a good example of the weal

    Jan 1, 1992

  • ISEE
    Energy-based Vibration Predictor Equations and Blast Damage Index for Blasting Gallery Panels

    By Sri C. Sawmliana, P. Pall Roy

    Damage to underground roof and pillars in blasting gallery (BG) panels has been an increasingly important area of study in recent years due to the invention of new explosives and cord systems which ha

    Jan 1, 2004

  • IIMP
    Hornos metalúrgicos para desmercurización

    By Holler W. Walter Enrique

    Dado que las entidades comercializadoras de concentración y minerales exigen que los productos mineros sean limpios, la organización minera diseñó y estudió una tecnología para la eliminación del Hg,

    Nov 8, 1984

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • AUSIMM
    Stacking and Reclaiming Facilities at South Blackwater Coal Mine, Queensland

    By Hoskings R

    Conceptual studies of the run of mine stockpiling and reclaiming requirements at Thiess Bros Pty Ltd South Blackwater coal mine commenced in 1975.Final selection of equipment was made in 1978 and the

    Jan 1, 1981