Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilling and Blasting on the Ty Nant Project.By Rob Farnfield, Ben Williams
The A5 road in the United Kingdom forms an ancient and well-used route through the hills and mountains of North Wales. In the 1990?s a programme of work was conducted to upgrade the road to modern sta
Jan 1, 2011
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused ProjectsBy Manuel Calderón
Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high
-
Manufacturing and Aging Effects on Pentolite BoostersBy Jeffrey W. Lin, Jonathan D. Abbott, Patrick R. Bowden, Tyson J. Plitt
Pentolite is a class of high explosives containing trinitrotoluene (TNT) and pentaerythritol tetranitrate (PETN) with PETN content typically ranging from 40 to 60 wt%. Manufacture involves melting TNT
Jan 21, 2025
-
Underwater Blasting Effects on Structures –A Model ApproachBy Chris Breeds, Larry Leone, Jerry Wallace
One of the Authors was recently retained to provide a professional engineering analysis of the potential impacts from underwater blasts used to enlarge intake tunnels at the Cheesman Dam near Denver i
Jan 1, 2012
-
Feasibility of Applying Probabilistic Risk Assessment to TerrorismBy Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson
"The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint
Jan 1, 2017
-
Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic VelocitiesBy M. Szumny, P. Mertuszka, K. Fuławka
Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati
Jan 1, 2024
-
Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability"Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate
Jan 1, 2017
-
What Broke the Burden? Improving our Understanding of Burden Breakout.By Mauritz Kotze, Jason Furtney, Ewan Sellers, Sandy Etchells, Tom Szendrei
The development of a simple model for gas flow and burden movement has driven the need to improve our understanding of burden breakage mechanisms for single hole blasts and the interaction between mul
Jan 1, 2013
-
The Development of a UN/DOT and ATF Compliant Special Effects Explosives Transportation Packaging/Storage Magazine SystemBy Tassilo Baur
In the motion picture/television industry and to some extent in the entertainment industries in general, there is often a need to use energetic materials to create special effects as part of a product
Jan 1, 2009
-
Blast Desification Techniques (An Operator's Guide)By Patrick D. McLaughlin, C Fordham
"The project outlined in the accompanying paper was to densify beach sands on the pond side ofa tailings dyke to the strength required for future dyke construction, This was to be achievedthrough the
Jan 1, 1992
-
A Kinematic Approach for Blast ModelingBy Ruilin Yang
Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.
Feb 1, 2020
-
The Use of Nonel Reefmaster AssembliesBy Kfw Eick
The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar
Jan 1, 1990
-
Damage Levels for Reinforced Concrete Columns Subject to Internal Explosive ChargesBy I. Petropouleas, J. Croll, R. Bassett
A programme of tests on controlled internal explosions to a class of circular reinforced concrete columns, has allowed the relationships between the blast energy and the extent of local damage to be u
Jan 1, 2006
-
The Renovation of Theodore Roosevelt DamBy Tom Hanke, Joe Strobbe
The 80 year old Theodore Roosevelt Dam built in a scenic canyon near Globe, Arizona is currently undergoing a major renovation. The old stone dam, built by hundreds of skilled stonemasons, is being co
Jan 1, 1993
-
The US DoD RBESCT Development of SAFERBy William Yutmeyer, Meredith Hardwick
Since 1996 there have been at least two teams formed within the U.S. Government to develop a consistent set of risk-based standards to be used to govern safety. The first of these was the Risk and Let
Jan 1, 2007
-
Vibration and Ground Rupture Criteria for Buried PipelinesBy Lewis L. Oriard
This paper describes the process of developing blasting specifications for 850 miles of new pipe trench running parallel to an existing high-pressure gas pipeline, often with as little as 14 ft to the
Jan 1, 1994
-
Demolition of Old Bridge Piers ByBlastingBy S. Mandal, R. Singh
The demolition of structures with explosive though most rapid, safe and efficient requires planned blast design parameters with respect to geometric and strength properties of the structure to be demo
Jan 1, 2001
-
Influence of Joint Directions in BlastingBy Sushil Bhandari
Presented here is the simplified process of fragmentation of homogeneous rocks by blasting based on experimental studies. Small scale single hole blasting experiments on jointed limestone are describe
Jan 1, 1983
-
Overview of the UNI Tronic™ Electronic Blasting SystemBy Albert van Niekerk, Mick Lownds
Overview of the UNI Tronic™ Electronic Blasting System
Jan 1, 2004
-
Increasing Back Break Using High Speed Blasting TechniquesBy Terry L. Cook
RAG Coal West, Inc., Belle Ayr Mine is located in the heart of Wyoming’s rich Powder River Basin coalfield. Belle Ayr utilizes an open pit, truck/shovel operation to strip the overburden off the 70’se
Jan 1, 2004