The demolition of structures with explosive though most rapid, safe and efficient requires planned blast design parameters with respect to geometric and strength properties of the structure to be demolished. The paper, here deals with successtil demolition of three old bridge piers by different blast designs. These piers were 11 m tall and very close to the existing bridge, The plan distance of the old piers from the existing bridge varied between 43 m and 14,25 m. The paper also deals with the mathematical concepts for the causes of such action of demolition/dismantling of structures.