Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Innovative Use Of Ground Improvement

    By Mark Koelling

    This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord

    Jan 1, 2010

  • DFI
    Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction

    By Gordon Chen

    As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester

    Jan 1, 2010

  • DFI
    The Stiffening Effect of a Caliche Layer on Pile Foundations

    By Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian

    "Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la

    Jan 1, 2015

  • DFI
    LRFD and Its Implications for QC/QA of Deep Foundations

    By Bernard Hertlein, Chia K. Tan

    "The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee

    Jan 1, 2005

  • DFI
    Hammer-Grout Piles At The Bronx-Whitestone Bridge

    By Ameir Altaee

    Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho

    Jan 1, 2010

  • DFI
    Seismic Rehabilitation Of Seattle's Pier 69

    By David Pierce

    The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie

    Jan 1, 1992

  • DFI
    Wick Drain Guide Specification (Method)

    "1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi

    Jan 1, 2014

  • DFI
    Challenging Ground Conditons during Flooding Lead to Innovative Deep Foundation Design Process and Load Test Evaluation

    By Glen M. Bellew, James F. Mehnert

    "The Kansas City District-United States Army Corps of Engineers has completed the design modification of a pile supported floodwall located along the Missouri River in Kansas City, Kansas. This deep f

    Jan 1, 2016

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Corroboration and Remediation Options

    "After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga

    Jan 1, 2004

  • DFI
    Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile Splice

    By John C. Ryan

    The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa

    Jan 1, 2010

  • DFI
    Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data Collectors

    By Donald T. Robertson

    This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p

  • DFI
    Completely Automatized Recognition of the Installation Process in Special Foundation Construction

    By Christian Hoyme, Jochen Maurer, Hans Regler

    Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be

    Sep 8, 2021

  • DFI
    Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PR

    By Filippo Maria Leoni, Wesley Schmutzler

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s

    Jan 1, 2015

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab