Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Combined Piled Raft Foundation (CPRF) response

    By G. L. Sivakumar Babu, P. Chaithra

    "Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration

    Jan 1, 2015

  • DFI
    Underpinning And Micropiling To A Four Storey Apartment Building In Hamilton, Scotland

    By Clifford J. Wren

    A geotechnical foundation solution was required to halt and prevent further structural distress suffered by a residential four storey apartment building in Hamilton, Scotland. Residents of the ten ye

    Jan 1, 2008

  • DFI
    Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation Project

    By Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus

    A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba

    Sep 1, 2022

  • DFI
    Recovery Efforts At The World Trade Center "Bathtub"

    By George J. Tamaro

    In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s

    Jan 1, 2002

  • DFI
    Slope Stabilization of Mill Creek Landslide Using Steel H-Piles

    By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis

    "Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2

    Jan 1, 2015

  • DFI
    Field and Laboratory Mix Trials for a Deep Soil/Cement/Bentonite Cut-Off Wall Using CSM Equipment

    By Russell J. Denny

    "A 25m deep cut-off wall is required for environmental remediation of a Former Chlor-Alkali Plant. Extensive trials were conducted to verify the effectiveness of the mixes proposed, with the requireme

    Jan 1, 2015

  • DFI
    Torque Correlation Factors For Round Shaft Helical Piles

    By Donald A. Deardorff

    The capacity of a helical pile can be determined analytically using the individual bearing or cylindrical shear methods which are dependent on soil strength parameters and helical bearing area. The t

    Jan 1, 2007

  • DFI
    Soil-Structure Interaction For A Tension Pile Pulled With Strand

    By Chandramohan P. V

    A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve

    Nov 1, 2022

  • DFI
    Dynamic Pile Testing for the Five Mates Bridge

    By Jonathan G. Cannon

    "This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and henc

    Jan 1, 1900

  • DFI
    A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - Synopsis

    By J. W. Slatter

    Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati

    Jan 1, 2000

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Design Of Self-drilling Micropiles For Permanent Applications

    By Racquel Nottingham, Freddy Lopez, Ole Gadermann

    The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Effective Plane Arrangement of Deep Mixing Piles to Resist Lateral Flow of Liquefied Ground

    By Daiki Takano, Naoki Takahashi, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa

    "The method in this study, in which cement-treated piles are installed into the ground to decrease the amount of liquefied lateral flow, has been studied. The authors are also investigating the most e

    Jan 1, 2015

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • DFI
    Effects of Atmospheric Conditions on Energy Pile Performance

    By Melissa S. Beauregard, Randall A. Pietersen

    This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou

    Jan 1, 2019

  • DFI
    Realizing The Benefits Of LRFD For Deep Foundations

    By Bernard H. Hertlein

    The introduction of LRFD methods for structural design has been a gradual process by AASHTO, ACI, AISC, ASCE, and the FHWA, which has largely been ignored by the deep foundations industry. In 2007, ho

    Jan 1, 2007

  • DFI
    Design And Specification Considerations For Environmental Cutoff Walls

    By Daniel Ruffing, Jeffrey Evans

    Vertical cutoff, or barrier, walls are an integral part of environmental site remediation efforts. Vertical barriers are commonly deployed to limit the influx of clean ground water and/or to control t

  • DFI
    Segmented Prestressed Concrete Piles For Coastal Environments ? Synopsis

    By S. Ahmed

    Critical factors of selection, fabrication, installation, and splicing of prestressed concrete piles are discussed based on experiences with coastal subsurface conditions of the United States of Ameri

    Jan 1, 2010

  • DFI
    Hybrid Foundation Solution for Debris Fill, Compressible Soil

    By Michael J. Weaver

    Urban redevelopment projects are occurring more frequently than ever before as urban greenfield sites become limited and city planners and devel- opers attempt to revitalize existing underdeveloped n

    Apr 1, 2022