Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle MineBy Tony Francelj, D. Scott Scovira, Remi Proulx
The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi
Jan 1, 2002
-
Increasing Cast Blasting Benefit with the Use of High Speed Motion Picture Photography and AnalysisBy John L. Floyd
The use of explosive energy to displace overburden or waste material can provide substantial savings to operations which normally rely on mechanical means for material removal. To optimize the availab
Jan 1, 1988
-
Case Studies in the Application of Firing Time OptimizationBy Sharon K. Reamer, Yvan Sifre, Klaus-Gunter Hinzen
"Three case studies are presented that illustrate the successful application of firing timeoptimization (hybrid modeling) in the quarry environment and for a construction site. In allcases, the method
Jan 1, 1993
-
Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock ConditionsBy Luis Huaroc, Jorge Cardenas, José Salvador
One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents
Jan 26, 2026
-
Implementation of Track & Trace Solutions in Existing Production EnvironmentsBy Frank Hirthammer
The paper explains the procedure of implementing Track & Trace solutions for manufacturers of explosives based on customer experiences. By using concrete examples, the process from project start to im
Feb 1, 2020
-
Diamonds are a Driller's Best FriendBy Langdon T. Mitchell, Karl Ingmarsson
The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.
Jan 1, 1999
-
Effects of Surface Mine Blasting on Underground Mine OpeningsBy Michael K. Phang, Thomas A. Simpson
Field studies at an underground mine site were conducted to evaluate and monitor blast-induced vibrations on an underground coal mine roof. The vibration data were evaluated so that a suitable damage
Jan 1, 1984
-
Can Small Diameter Holes and Low-Density Product Improve Pre-Split Results?By Jim Daley
This case history discusses a pre-split test conducted at BHP Mineralss Navajo Mine in Fruitland, New Mexico. The test was an extension of earlier pre-split testing conducted by Virgil Stachura of the
Jan 1, 1996
-
Cosmar and BlastingBy Lee W. Saperstien
Section 709 of Public Law 95-87, "Surface Mining Control and Reclamation Act of 1977," requests the National Academy of Sciences to determine if the standards of the act are applicable to minerals oth
Jan 1, 1979
-
Analysis of Sympathetic Detonation in Detonating CordBy Josh Calnan, Paul M. Holmgren, Abigail N. Styer
Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN
Feb 1, 2020
-
The Safe Elimination of Buried Explosives Near Gillette, WyomingBy William H. Snyer, Victor A. Sterner
A cache of buried explosives was discovered by ICI Explosives, USA Inc. at one of their sites near Gillette, Wyoming. An intensive investigation conducted by ICI management indicated that nitroglyceri
Jan 1, 1997
-
Reducing a Quarry Global Carbon Footprint through Blast OptimizationBy Pierre DePasquale, Ricardo Chavez
Lowering of quarry energy consumption participates to answer both environmental and financial issues. The “EE-Quarry” European project, supported by the European Commission (EE stands for Energy Effic
Jan 1, 2015
-
New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.By Samir Garcia, Alain Mestanza
This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph
Jan 21, 2025
-
Explosives Training Modules and Econex ApproachBy Fred C. Drury
The Explosives Engineer's concern for personnel training in the safe, efficient and effective use of explosives materials has grown in recent years. Available training options have also grown. Today's
Jan 1, 1981
-
Vibration impact reduction to the community through low density bulk emulsion.By E. Líder, J. Pavez, J. Rivera
The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a
Jan 1, 2024
-
The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by BlastingBy Kis M
The purpose of seismic control of blasting is to indicate the vibration magnitude or to eliminate the occurrence of vibration damage caused by blasting. At the Mining Research Institute in Hungary, a
Jan 1, 1979
-
Seismic Modelling Control Of Blasts In A Nuclear Power PlantBy Alain Blanchier, Pascal Bernasconi
Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati
Jan 1, 2008
-
Considerations in Pre-Split Blasting for Mines and QuarriesBy J Lyall Workman, Peter N. Calder
"Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.
Jan 1, 1993
-
Implementation of a Real Time Traceability System from Mine to PlantBy R. Ticona, J. Alarcon
In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel
Jan 1, 2024
-
Blasting and Its Control at Hydro QuebecBy Wilfrid Comeau
Since 1967 Hydro Quebec has undertaken the control of blasting and its effects at its power development sites. Blasts have been monitored using a commercially available three component seismograph. In