The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by Blasting

International Society of Explosives Engineers
Kis M
Organization:
International Society of Explosives Engineers
Pages:
8
File Size:
186 KB
Publication Date:
Jan 1, 1979

Abstract

The purpose of seismic control of blasting is to indicate the vibration magnitude or to eliminate the occurrence of vibration damage caused by blasting. At the Mining Research Institute in Hungary, a new method has been developed to determine the method of delay. Near the blasting site (within 100-200 meters), the peak value of the particle velocity is determined by calculation and also by measurement. In the calculations, the time error of the electric detonators is taken into consideration. During the test program, the results of the experimental blasts and the calculated data have shown good correlation. The method of calculation helps the operator eliminate vibration damage, while the greatest quantity of charge can be detonated.
Citation

APA: Kis M  (1979)  The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by Blasting

MLA: Kis M The Influence of Time Error of Electric Detonators on the Amplitude of Vibration Generated by Blasting. International Society of Explosives Engineers, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account