Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Influence of Surface Replacement Layer on Behavior of Laterally Loaded Large Bored Piles in Soft Clay: Pile Load Tests and Numerical InvestigationBy Hayel M. El-Naggar, Mohamed Sobhi, Mamdouh M. Hamza, Marawan M. Shahien
"This paper presents the results of two lateral load tests on large bored piles in soft clay deposit for a major site in northern Egypt. The tests are carried out on 0.8 m diameter piles. One of the t
Jan 1, 2016
-
Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity GainBy Terrence M. Carroll, Chu E. Ho
"A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of
Jan 1, 2015
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St CenturyBy David Wilshaw
Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves
Oct 1, 2022
-
Evolution Of Deep Foundation Systems Used At The Port Ivory Intermodal Facility Site; 1906 ? 2004By Aly M. Mohammad
The Howland Hook Terminal Facility located in Staten Island, New York is one of the most active container terminals in the Northeast United States. Due to the high capacity of the facility, the Port A
Jan 1, 2004
-
Artificial Ground Freezing: A Smart Application Below The Airport Of PerthBy Luca Pingue, Regine Jagow-Klaff, Franco Muratore, Carlandrea Albonico, Damiano Frontini, Rudolf Wernecké
This paper describes an artificial ground freezing (AGF) application carried out to ensure both watertightness and structural support for the safe excavation of four cross passages of the Forrestfield
May 1, 2022
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast LoadsBy Michael Oakland
This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
-
Strength Behavior of Soilcrete Improved by Cement and MetakaolinBy Guo Qian, Du Guangyin, Deng Yongfeng, Liu Songyu, Wang Ningping
"Metakaolin (MK) can efficiently enhance the strength and the impermeability of concretes and mortars. However, it has rarely been attempted in admixtures of cement-stabilized soils until presently. A
Jan 1, 2015
-
Experience-Based Value Engineering of Foundations & Deep Excavation Support SystemsBy Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte
Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects
Sep 8, 2021
-
Pile Driving Dilemma: Reducing Noise, VibrationsBy Michael D. Justason
"In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de
Jan 1, 2012
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
A 16 M Deep Basement Excavation in Kuala Lumpur Karst: Mixed Retention SolutionBy Serhat Baycan, Mikias Yohannes
"Kuala Lumpur Karst is a complex limestone formation that is characterized by presence of cavities, solution channels, pinnacles and floaters. Basement excavations in such geological formations are us
Jan 1, 1900
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001