Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Piled Raft Floats On MoraineBy Terence P. Holman
Instrumented load testing of high capacity micropiles, followed by detailed analysis and numerical modeling, provided an opportunity for real foundation performance to be incorporated into the design
Jan 1, 2007
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Interactive Encased Stone-Column Foundation - SynopsisBy P. M. Deshpande
An interactive short column system is evolved as alternative to deep foundation system in deep layers of marine clay, the interaction of encased stone column and marine clay carry load without causing
Jan 1, 1996
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital StructuresBy Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004
-
The Cosmopolitan Resort & Casino, Las Vegas, NV Specialty Foundation Work Under Extreme ConditionsBy Lawrence Piccagli
This past spring of 2006, BENCOR installed the concrete reinforced diaphragm walls for the COSMOPOLITAN RESORT & CASINO in Las Vegas, Nevada. The project highlights include the excavation of approx. 3
Jan 1, 2007
-
Underpinning Of A 16th Century Cistercian Abbey FoundationBy Michel Bustamante
The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou
Jan 1, 2002
-
Pile Construction And Related Problems ? SynopsisBy K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
Helical Piles With Grouted Shafts - A Case HistoryBy Shawn Downey
A helical pile with in-situ grouted shaft was used to underpin the existing slab of a large retail store in the Edmonton, Alberta Canada area. The existing structural slab did not have the capacity to
Jan 1, 2003
-
Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1998
-
Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? SynopsisBy H. S. Radhakrishna
Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu
Jan 1, 2010
-
Base Grouted Piles In Thanet Sands, LondonBy D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
Osterberg Cell Tests Confirm In-Situ Pier Capacity In Colorado - IntroductionBy William Siegel
Kleinfelder provided foundation analysis and design for an expansion to a cement plant in Florence, Colorado. The expansion was a conversion from a horizontal wet process to a vertical dry process, a
Jan 1, 2007
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 260 Load TestsBy Jesús E. Gómez
A recent bridge underpinning project provided a unique opportunity to obtain information on the load-deflection response of 260 hollow-core bar micropiles. All production micropiles were proof-tested
Jan 1, 2007
-
Pier Design And Construction In Water Bearing Soils ? SynopsisBy C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
Axial Pile Response Evaluation By Geophysical Piezocone TestsBy Paul W. Mayne
The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu
Jan 1, 2002
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
Micro-Biological Attack On Deep Foundation ConcreteBy Piotr D. Moncarz
As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr
Jan 1, 2002
-
Axial Capacity Of Drilled Shafts In Soft ShaleBy Kanagarajah Ravishankar
Drilled shaft (caisson) foundations are extensively used in the past. In the central part of New Jersey, the soils consist of silt and clayey silt overlying Triassic age shale bedrock. The shale is fr
Jan 1, 2006
-
Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container ShipsBy Bill Paparis
The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which
Jan 1, 2013
-
Foundation Code8 And Linit 8tatb Partial Factoring - SynopsisBy W. G. K. Fleming
The codification of foundation design and construction is a subject of extensive discussion in Europe and all current code proposals are based on limit state partial factoring. For simplicity, it is c
Jan 1, 1996