Pier Design And Construction In Water Bearing Soils ? Synopsis

Deep Foundations Institute
C. N. Baker
Organization:
Deep Foundations Institute
Pages:
9
File Size:
729 KB
Publication Date:
Jan 1, 2010

Abstract

The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the design and construction stage is outlined. Four case histories illustrating the design and construction considerations for four different problem soil and ground water profiles are presented, including the field testing and observation procedures that were utilized to confirm that the design inten. was accomplished. Requirements advisable when placing concrete under water in a cased environment and when placing concrete under slurry in an uncased environment are described.
Citation

APA: C. N. Baker  (2010)  Pier Design And Construction In Water Bearing Soils ? Synopsis

MLA: C. N. Baker Pier Design And Construction In Water Bearing Soils ? Synopsis. Deep Foundations Institute, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account