Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral Spreading

    By E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian

    "A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,

    Jan 1, 2015

  • DFI
    Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental Observations

    By Andrew Budek

    "Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini

    Jan 1, 2005

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • DFI
    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    Geophysical Methods For Site Characterization For Marine Foundations

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri

    Jan 1, 2013

  • DFI
    Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil Nails

    By Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko

    Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan

    Jan 1, 2017

  • DFI
    Influence of Different Parameters on the Behavior of Laterally Loaded Piles in Sand

    By Musbah A. Hasan, Ahmed M. Nasr, Fauzi Jarushi

    Many transmission towers, high-rise buildings and bridges are supported by piles. These structures may be subjected to large lateral loads. Therefore, experimental investigations on model piles under

    Jan 1, 2017

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • DFI
  • DFI
  • DFI
    Eglinton Crosstown - Over and Under the Existing Subway

    By Shawna Munn, Sarah Speir

    Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission

    Jan 1, 2023

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • DFI
    Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic Loads

    By P. Kiruthika, A. Murali Krishna

    Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp

    Sep 1, 2022

  • DFI
    Deep Mixing Core Data from LPV 111

    By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu

    "One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing

    Jan 1, 2015

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
    Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years Later

    By Karl A. Higgins

    In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages

  • DFI
    Numerical Analysis in Assisting Crane Pad Design and Underground Utilities Evaluation

    By Yazen Khasawneh, Yao Zhang

    Upgrading and maintenance programs were proposed at a power generating plant in Indiana. To perform construction activities associated with the proposed upgrading and maintenance, a LR11350 crawler cr

    Jan 1, 2019