Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Istanbul Strait Road Tunnel Project—Seismic Joint and Passive Fire Protection in Double Deck TBM TunnelBy Basar Arioglu, Jaeung Kim, Mehmet Öztürk, Jinmoo Lee, Dongho Lee, Taek-Kon Kim
"Istanbul Strait Road Tube Crossing Project (Eurasia Tunnel) includes 3.34 km of a bored double-deck tunnel under the Bosphorus Strait, at a maximum depth of 106 m from the sea level, and 1 km of twin
Jan 1, 2016
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution modelsBy D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi
Jul 25, 2018
-
Effects of Atmospheric Conditions on Energy Pile PerformanceBy Melissa S. Beauregard, Randall A. Pietersen
This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou
Jan 1, 2019
-
Planning for Commercial Operation of the Honeymoon ISL Uranium ProjectA recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197
Jan 1, 2002
-
A Comparison Of Environmental Permitting Requirements And Costs Chile And The Last FrontierBy R. T. Richins
Coeur d'Alene Mines Corporation (CDE) is a precious metals mining company. The company's three mining operations are located In Nevada and Idaho. Collectively, these mines (Rochester in Neva
Jan 1, 1993
-
Contreting The Deep Shafts And Tunnel For New York City's Third Water TunnelBy Edward S. Plotkin, Gary A. Almeraris, Thomas F. Peyton
The lining of the tunnel and shafts for a new section of New York City's- water system required extensive components to produce, deliver and place a continuous tunnel linning. The project placed
Jan 1, 1987
-
OFR-1-75 Environmental, Economic, And Social Impacts Of Mining Copper-Nickel In Northeastern MinnesotaBy Ronald M. Hays
The Duluth Gabbro Complex in Northeastern Minnesota possibly contains a significant domestic copper resource and the nation's largest nickel resource. Exploration has discovered large low-grade c
Jan 1, 1974
-
A New Generation of Web-Based Applications for Mine DesignBy Nathaniel Schaefer, Christopher Newman, Zach Agioutantis
"As mining reserves continue to be developed in deeper and more complex geological and geometric conditions, there has been an increased demand for underground mine designs to better reflect site-spec
Jan 1, 2017
-
Lithogeochemical Methods for Acid Rock Drainage Studies and Prediction (21fda537-5d97-4c5d-a948-0ea0da822bed)By Hans E. Madeisky, Bruce W. Downing
The acid rock drainage (ARD) buffering capacity of mine waste is governed by its bulk chemical composition and its mineral assemblage. Conventional acid base accounting (ABA) tests can be used to pred
Jan 1, 1997
-
Simulation of Bulk Earthwork and Quarry Material Delivery During Surface Mine TransformationBy S. Duvah Pentiah
The transformation of an open pit coal mine to a horizontal-punch underground mine is subject to a number of challenges. These include scheduling the operation of various sizes of trucks over a long p
Aug 1, 2013
-
Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017
-
Floating performance of a new mixed chelate collector in reverse floatation of anshan style iron oreBy T. Wang
A new kind of mixed chelate collector was prepared in order to separate gangue (mainly quartz) and iron minerals efficiently during room temperature. The collector was was composed of two chelate coll
Jan 1, 2014
-
El Oxígeno de la Empresa Minera: Un Modelo de Innovación ExitosoBy Ruth Escobar
Así como los seres vivos necesitan del oxígeno para vivir, las empresas mineras precisan de un modelo de innovación exitoso para ser competitivas hoy y en el futuro, esta es la síntesis del trabajo de
Sep 30, 2022
-
Failure Mechanisms in Thermo-Mechanical Fatigue of DS Superalloy Rene 80By E. O. Abrokwah
Directionally solidified (DS) Rene 80 Superalloy was tested in thermo-mechanical fatigue (TMF) over the temperature range 500-900°C and plastic strain levels from 0.2 to 0.8% using a DSI Gleeble therm
Jan 1, 2011
-
International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja
Jan 1, 1997
-
Learnings from Infrastructure Replacement within an Operating RefineryBy L. Trytten, S. Bass, P. Nawrocki, J. Mercer
The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am
Jan 1, 2015
-
Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community RelationshipBy N Boughen, K Moffat, L Brooks, A Zhang
In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese
Jun 28, 2016
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
Real-Time Simulation of Earthmoving Projects Using Automated Machine GuidanceBy F. Vahdatikhaki
Simulation techniques have offered significant boosts toward a cost-and-time-optimized planning of construction projects by enabling project managers to effectively comprehend the behavior of projects
Aug 1, 2013