Structure Support on Laterally Swept PilesBy Morgan L. Race, Matthew R. Glisson
"Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval
Jan 1, 2017
-
Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case StudiesBy Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste
Jan 1, 2017
-
Development Process for a Greater Capacity Propsetter® SystemBy Christopher J. Brown
"Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed
Jan 1, 2017
-
Holden Mine — Application of Jet Grouting to Improve Stability of a Tailings Embankment in a Narrow Mountain ValleyBy P. Crouse, J. Obermeyer
"INTRODUCTION Site location and history The Holden Mine is a former underground copper mine that was developed and operated by the Howe Sound Mining Company (Howe Sound) from 1938 to 1957. The mine is
Jan 1, 2017
-
Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground ConditionsBy Emad Farouz, Francis A. Abreu
"This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla
Jan 1, 2017
-
A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE EmbankmentBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a
Jan 1, 2017
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Concentration of Rare Earth Minerals from Coal by Froth Flotation (Minerals & Metallurgical Processing, 2017, Vol. 34, No. 3, pp. 132-137)By J. Groppo, W. Zhang, R. Honaker
"Rare earth elements (REEs) found in coal are in the form of minerals, ion-adsorbed onto clay surfaces or inner layers, or organically bound. Rare earth minerals such as monazite exist in coal and hav
Jan 1, 2017
-
Capacity of Hydraulically Jacked PilesBy Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Case History: Large Diameter Micropiles for the Highway 53 Relocation ProjectBy Nathan W. Iverson, David S. Graham, Paul J. Axtell
"The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a
Jan 1, 2017
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial DepositsBy John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled ShaftsBy Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Driving and Extraction of Steel Pipe Piles in Nearshore EnvironmentBy Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez
"A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br
Jan 1, 2017
-
Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)By J. Cayouette, C. Bolduc, P. Blatter
"The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext
Jan 1, 2017
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South AmericaBy Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New OrleansBy Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017