Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Design And Construction Of The Deepest Cfa Pile In AustraliaBy W. L. Chong
For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und
Nov 1, 2022
-
Design And Construction Of The Exploratory Shaft Facility -A Regulatory PerspectiveBy J. Peshel
This paper presents a regulatory perspective of the design and construction of the Exploratory Shaft Facility which may become part of the future high-level waste repository. Site characterization con
Jan 1, 1989
-
Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? IntroductionBy Geoffrey Hughes
The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive
Jan 1, 2008
-
Design and Construction of the Gilon Railway Tunnels in Karstic RockBy M. Wittke
"In the course of the extension of the railway network in Israel, currently the two 4.6 km long tubes of the Gilon Tunnels on the line from Akko to Carmiel are being constructed. The tunnels run throu
Jan 1, 2015
-
Design and construction of the Montana Tunnels tailings disposal facilityBy K. J. Brouwer, J. P. Haile
"Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi
Jan 1, 1988
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Design and Construction of the New VDOT Midtown TunnelBy Rick Ellman, Ian Chaney
"The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a
Jan 1, 2014
-
Design And Construction Of The Noranda Converter At The Borne SmelterBy Michel Boisvert
Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions
Jan 1, 1998
-
Design And Construction Of The Soudan 2 Detector LaboratoryBy D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel
With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg
Jan 1, 2018
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f
Jan 1, 2013
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific OceanBy Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Design And Construction Of Uranium Disposal Facilities For The Panna Maria Project, TexasBy Rod A. Levander, Kenneth B. King
INTRODUCTION The Panna Maria Uranium Project is located in South Texas, between San Antonio and Corpus Cristi, approximately 10 kilometers (6 miles) north of Karnes City, Texas. The tailings dispos
Jan 1, 1980
-
Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent CriteriaBy P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz
Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea
Jan 1, 1989
-
Design And Construction Options For Surface Uranium Tailings ImpoundmentsBy A. MacG. Robertson
INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re
Jan 1, 1980
-
Design and construction outlined of the Cannon mine tailings impoundmentBy Ian Hutchison, Ted Sluder, Jack Caldwell, Don Moore
Introduction The Cannon mine at Wenatchee, WA has recently been brought into operation to recover gold from the sandstones of the Swauk formation. The mine is a joint venture between Asamera Minerals
Jan 8, 1986