Search Documents

Sort by

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • CIM
    Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final Reconciliation

    By Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto

    "The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Construction Of A Spillwall In The Columbia River

    By Francis B. Gularte

    The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw

    Jan 1, 2010

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • AUSIMM
    Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

    By N Wharmby

    In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh

    Mar 8, 2011

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • SME
    Construction of Coxwell Bypass Tunnel Project in Toronto, ON - RETC2023

    By Ehsan Alavi, Eren Kusdogan

    The City of Toronto’s Coxwell Bypass Tunnel is currently being constructed by North Tunnel Constructors ULC, a joint venture of Jay Dee Canada, C&M McNally Tunnel Constructors and Michels Canada. This

    Jun 13, 2023

  • DFI
    Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR

    By Vince Luongo

    "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project

    Jan 1, 2006

  • SME
    Construction Of Explosion Resistant Seals

    By C. R. Stephan

    Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations

    Jan 1, 1997

  • SME
    Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock

    By Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima

    "In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an

    Jan 1, 2016

  • DFI
    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • SME
    Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

    By Jamal Rostami, Ataollah Rahbar

    "Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a

    Jan 1, 2016

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • SME
    Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking

    By Peter van Dijk, Gary Almeraris, Philip Rice

    This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A

    Jan 1, 2001

  • SME
    Construction Of Large Diameter Shafts With Reinforced Concrete Ring Beans

    By Daniel L. Hanson

    This paper presents case histories of the construction of four large diameter circular shafts using reinforced concrete ring beams as the primary internal support system. The case histories pertain to

    Jan 1, 1987