Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UKBy Trevor I. Addenbrooke
Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade
Jan 1, 2002
-
Design Of Drilled Shaft Supported Mat Moscow TowersBy Issa S. Oweis
Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t
Jan 1, 2007
-
Performance Of Drilled Displacement Piles In The Midwestern United StatesBy W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Newtown Creek Pile Foundation Work 2009By Thomas Trochalides
Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity
Jan 1, 2010
-
Instrumented Load Tests On Closed-And Open-Ended PilesBy Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
Real-Scale Tests on Soil Mix ElementsBy Nicolas Denies, Gust Van Lysebetten, Bart Lameire, Jan Maertens, André Vervoort, Noël Huybrechts, Flor De Cock
"Abstract Originally developed for ground improvement works, the deep mixing method (DMM) has increasingly been applied in recent years for the realization of soil and water retaining structures and a
Jan 1, 2014
-
Anchoring Tall Buildings In Lower ManhattanBy Andrew Pontecorvo
The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,
Jan 1, 2011
-
Jetting-Assisted Sheet Pile DrivingBy Marie-Pierre Bourdouxhe-Barnich
Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d
Jan 1, 2002
-
Performance Of A Large Diameter Drilled PierBy A. J. Partos
One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan
Jan 1, 1989
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UKBy Shane Baker
Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl
Jan 1, 2006
-
Special Foundation Systems - IntroductionBy D. A. Greenwood
Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa
Jan 1, 1991
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Technical VisitBy the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Practical Experience With Nondestructive Testing Of Augered Cast-In-Place PilesBy Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial DepositsBy Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in ChicagoBy Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Evaluation Of Pile Load Test ResultsBy Rasin Duzceer
In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed
Jan 1, 2002