Arctic Emergency Operation: Deception Bay Rehabilitation
By Jeff Starchuck, Harald Kullmann
"In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope
Jan 1, 2009
-
Using Multiple Pile Types On A Single Project To Maximize Benefits
By James F. Davis, Matthew A. Conte, Robert F. Tonning
This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted
-
Data Management Guide Specification
By Laurel E. Blackman
The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co
Jan 1, 2021
-
A Fully Connected Jobsite is a Must for the Future
By Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Seepage Barrier Mix Design Development, Installation, and Evaluation
By George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, Canada
By Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and Micropiles
By Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen
"This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build
Jan 1, 2017
-
BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODS
By Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers
Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction
By Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Construction Considerations For Ground Modification Projects ? Synopsis
By J. P. Welsh
Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan
Jan 1, 2010
-
Fogg Museum Expansion - Support of Excavation Design and Construction
By James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project
By Seth H. Hamblin, Leo J. Hart, John E. Regan
The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the
Jan 1, 2019
-
Performance of Cement Deep Mixing Method in 2011 Tohoku Earthquake
By Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa
"Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c
Jan 1, 2015
-
Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance
By Glen Mann, H. G. Vestberg, Robert D. Holtz
"Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically
Jan 1, 2005
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge
By Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
-
Sustainable Products For Geotechnical Works
By Marcus Daubner, Karsten Beckhaus, Florian Bauer
The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable
May 1, 2022
-
Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC
By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017