Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Understanding the Causes of Roof Control Problems on a Longwall Face From Shield Monitoring Data ? A Case Study

    By Robert Trueman

    This paper details the results of an assessment aimed at understanding the shield loading mechanisms associated with strata-related issues on a longwall face. Shield load cycle analysis theories devel

    Jan 1, 2011

  • SME-ICGCM
    Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.

    By Styles P.

    To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est

    Jan 1, 1992

  • SME-ICGCM
    Load Deformation Behavior Of Simulated Longwall Gob Material

    By Deno M. Pappas

    The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual

    Jan 1, 1993

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Introducing the New Windows ARMPS-LAM Program

    By Keith Heasley, Christopher Newman, Zach Agioutantis

    "Previously, in 2013, a laboratory version of the computer code ARMPS-LAM, introduced at the 32""d International Conference of Ground Control in Mining, successfully integrated the laminated overburde

    Jan 1, 2016

  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Support of Tunnels in South African Gold Mines

    By L. Z. Wojno

    Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee

    Jan 1, 1987

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Continuing Development of Innovative Cable Support Systems

    By John G. Oldsen

    Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new

    Jan 1, 1997

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    A Decade of Mobile Roof Support Application in the United States

    By Larry Howe

    Second, or retreat mhng with Mobile Roof Supports (MRS) has now been part of coal mining in the United States for a decade Their utilization has evolved into mining applications which vary in seam hei

    Jan 1, 1998

  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Support Selection For The Multi-Lift Mining Method

    By Claude A. Goode

    Large quantities of high grade coal exist in thick seams in the United States. Many of these thick seams are too deep to be surface mined and do not lend themselves readily to underground extraction.

    Jan 1, 1981

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Critical Roof Span Approach To Selection Of Proper Coal Mine System

    By Antoni Kidybinski

    Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls

    Jan 1, 1982

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984