Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

International Conference on Ground Control in Mining
Huamin Li Huigui Li Yongxiang Xu Yuan Ruifu Shuaishua Yue Kun Li
Organization:
International Conference on Ground Control in Mining
Pages:
10
File Size:
2353 KB
Publication Date:
Jan 1, 2015

Abstract

"Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft (3.8m) and the top coal caving height was 36.7 ft (11.2m). The gateroad pillar between panels was 124.6 ft (38m). During retreat mining, serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore, pillarless mining was experimented.Using numerical modeling and comparative study of cases of similar mining condition, it was decided to employ a 19.7 ft (6m) wide pillar, rather than the previous 124.6 ft (38m) wide pillar. Support system for the gateroads was designed and implemented. During gateroad development, pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion.Since the development of gateroad has just completed, and retreat mining has not begun, the effectiveness of the proposed methods is unknown at this point. However, monitoring will continue until after mining. The results will be published in a separate paper.INTRODUCTIONGeneral descriptionTashan mine is located about 15 Km south of the city of Datong, Shanxi province, China (aure 1). The 2014 raw coal production was 25 million mt."
Citation

APA: Huamin Li Huigui Li Yongxiang Xu Yuan Ruifu Shuaishua Yue Kun Li  (2015)  Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

MLA: Huamin Li Huigui Li Yongxiang Xu Yuan Ruifu Shuaishua Yue Kun Li Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height. International Conference on Ground Control in Mining, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account