Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Use of FrothSim to Optimise the Water Addition to a Column Flotation Cell

    By J J. Cilliers, K Hadler, A W. Stra

    This paper examines the use of the FrothSim flotation simulator to improve the performance of an industrial column flotation cell. The performance of an industrial retreat column cell is simulated, an

    Jan 1, 2005

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Sources and Facility of Ignition in Coal Mines

    In a coal mine there are many substances capable of ignition under certain circumstances, which can be placed in the following groups: ordinary combustible solids, dusts, liquids and vapours, gase

    Jan 1, 1981

  • AUSIMM
    What category cyclone is devastating your plant?

    By T G. Vizcarra, B Wong

    Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y

    Aug 29, 2018

  • AUSIMM
    Geometallurgical Modelling and Ore Tracking at Kittilä Mine

    By M Wortley, J Korteniemi, D La Rosa, L Rajavuori

    Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno

    Nov 24, 2014

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Application of Alternative Lixiviants for Secondary Heap Leaching of Gold

    By N Stockton

    Some preliminary results on the secondary leaching of previously heap leached gold ore are presented. Alternative lixiviants for gold comprising chlorine, thiourea and thiosulphate were compared with

    Jan 1, 2000

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Installation of an Underground Dispatch System and its Use in Business Performance Management Within OsborneÆs Mining Department

    Within the Business Process Improvement Program initiated at Placer Dome during 2003 was the Business Performance Management Project (BPM).BPMÆ s aim has been to extract productivity improvements from

    Jan 1, 2005

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    A Downhole Magnetic Tensor Gradiometer for Developing Robust Magnetisation Models from Magnetic Anomalies

    By C A. Foss, K Blay, K Leslie, D Hillan

    Magnetic field studies provide remote sensing of magnetisation distributions and a means to investigate moderately- to strongly-magnetised ore deposits that may be partially or totally buried. However

    Jul 13, 2015

  • AUSIMM
    A Fatigue Equivalent Static Load Methodology for the Fatigue Life Estimation of Load Haul Dumpers

    A methodology for the fatigue life estimation of load haul dumpers, employed in underground platinum mines, has been developed and applied. This method entails the quantification of operating conditio

    Jan 1, 2005

  • AUSIMM
    Tele-Operation at Freeport to Reduce Wet Muck Hazards

    By S Dirdjosuwondo, R Plaisance, L Thoma

    PT Freeport Indonesia, a subsidiary of New Orleans-based Freeport McMoran Copper and Gold of New Orleans, operates a large mining complex on the Western half of the Island of New Guinea in Tembagapura

    Jan 1, 2000

  • AUSIMM
    Disseminated Gold Mineralisation in a Schist-Hosted Mesothermal Deposit, Macraes Mine, Otago, New Zealand

    By B Petrie, D J. MacKenzie

    The Macraes mine is producing 175 000 ounces Au/year from a mesothermal deposit with total resource of at least five million ounces. The deposit is hosted in greenschist facies Otago Schist, a widespr

    Jan 1, 2004

  • AUSIMM
    Linear Motion Versus Circular Motion on Vibrating Screens

    This paper will discuss specifically the performances of vibrating screens having circular motion with inclined decks and linear motion with horizontal or near horizontal decks and both related main

    Jan 1, 1984

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Cathodoluminescence Microscopy Applied to the Examination of Lake Superior District Iron Ores

    By R Graber, R Johnson

    North American steelmaking practices have evolved based on access to iron ore raw materials containing very low phosphorus contents, typically less than 0.025 per cent P. Cleveland-Cliffs managed Tild

    Jan 1, 2005

  • AUSIMM
    A Simple and Proven Technology for Reclaiming Acidic Mine Waters

    By B Mack

    The cost of water treatment is now more than ever a major consideration for maintaining an environmentally and economically sustainable mining operation. As an industry, we often have to consider wate

    Jan 1, 2009