A tailored solution to determine plant capacity using strategic analysis

The Australasian Institute of Mining and Metallurgy
J Dray J Nortier
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
15
File Size:
569 KB
Publication Date:
Jun 22, 2022

Abstract

There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availability of power, the availability of water, and a myriad of other considerations. There is also no single solution to the question of how big the project should be. However, to develop a project, the study team needs to select the configuration options that it regards as the best for the project. To be able to make this selection, the study team should consider the range of available options and do so at a level of detail that gives it confidence in the conclusion but does not lead to multiple detailed design exercises. Having considered the range of options, and with a clear definition of the project owner’s objectives and constraints, the work to be carried into feasibility studies can be focused appropriately. This paper discusses the process of completing strategic mine planning to identify project configuration options to assist in the selection of the processing plant throughput rate (Capacity Study) for a large greenfield open pit mine. The processes described in this paper allow for the basis of design to be set for subsequent studies that meets the objectives at a risk profile acceptable to the owner.
Citation

APA: J Dray J Nortier  (2022)  A tailored solution to determine plant capacity using strategic analysis

MLA: J Dray J Nortier A tailored solution to determine plant capacity using strategic analysis . The Australasian Institute of Mining and Metallurgy, 2022.