Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti
Dec 1, 2022
-
Optimizing Mill Performance: Real—Time Grinding Insights - SME Annual Meeting 2025By Karl Gugel, Dante Garcia, Peter Czel, Eduardo Nunez, Joshua Morales, Boris Sullcahuaman
Real-time operational excellence is achieved through the seamless integration of various components. Key aspects include precise instrumentation, real-time data collection, data analytics, and an effi
Feb 1, 2025
-
Evaluation of Different Carbon Monoxide Sensors for Battery Charging Stations (Mining, Metallurgy and Exploration)By Richard A. Thomas, Liming Yuan, Lihong Zhou, James H. Rowland
Hydrogen (H2) gas released during battery charging can result in cross-interference for carbon monoxide (CO) sensors used for early fire detection and compromise the integrity of the mine atmospheric
-
Simulation of Recovery of Upper Remnant Coal Pillar While Mining the Ultra-Close Lower Panel Using Longwall Top Coal CavingBy Pengfei Wang, Guorui Feng
"With the depletion of easily minable coal seams, less favorable reserves under adverse conditions have to be mined out to meet the market demand. Due to several historical reasons, a large amount of
Jan 1, 2019
-
Use Of The Coulter Counter For Particle Size Analysis Of Cement And Related MaterialBy O. E. Brown
The measurement principle of the Coulter Counter for particle size analyses is described. The application of the Coulter Counter to cement particle content and size analysis and to the size distrib
Jan 1, 1960
-
Cover system to mitigate ARD in an arid climate - setup of field test plots at BHP Iron Ore's Mt. Whaleback operation (Technical Paper)By O. Porterfield, M. O’Kane, M. Endersby
BHP Iron Ore initiated research programs in January 1995 to develop long-term plans for decommissioning waste rock material at its Mt. Whaleback operation. More than 2 Gt (2.2 billion st) of waste roc
Jan 1, 2000
-
Development of an Underground Haulage System Evaluation Tool for Feasibility Studies Mining, Metallurgy and ExplorationBy L. Barnewold, A. Merchiers, M. Pütz, P. Jeschke, M. Dammers
The mining industry faces many difficult challenges, for example, lower ore grades, smaller and deeper deposits, and longer transportation distances. In the past, there have been remarkable innovation
-
Partial Summary Of Patents On Heavy Liquid SeparationsBy W. L. O?Connell
[Patent Issue No. Date Issued To Subject 386,504 July 24, G. Sweanor The separation of quartz from a 1588 metal with a liquid such as CS2 or CHC13 under water by introducing mixture into wate
Jan 1, 1963
-
Asset Maintenance Readiness By Metso Outotec - SME Annual Meeting 2022By E. Gutierrez, P. Gillies
Asset Maintenance Readiness (AMR) provides a tailored reliability and maintenance strategy specific to operational needs. AMR delivers reliability and maintenance foundations for the plant and equipme
Mar 2, 2022
-
Effects of Temperature and pH on Pressure Filtration of CoalRefuse Slurry Mining, Metallurgy and ExplorationBy G. S. S. Raman, M. S. Klima
Coal refuse slurries stored in tailings impoundments can potentially lead to environmental concerns such as effluent seepage, property devaluation, and in extreme cases, dam failures. Pressure filtrat
-
Appraisal Techniques To Rank A Corporate Set Of Exploration ProjectsBy S. Angioletti
This paper addresses strategic investment decisions when they are nested in a project development format where each project is implemented in phases and each phase is approved to move on to the next p
Jan 1, 2010
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Stopped Cracks And Changes In Fragment Shape And SlopeBy T. P. Meloy
Understanding the illusive nature of the catastrophic failure of brittle solids is difficult. Proposed is a hypothesis of crack cessation. If, during catastrophic failure, cracks in a brittle solid st
Jan 1, 1996
-
Three-Dimensional Ventilation Modeling of a Large-Opening Stone Mine Using COMSOL Multiphysics - SME Annual Meeting 2025By K. V. Raj, VASU GANGRADE
Airflow in large-opening stone mines is largely dependent on the natural ventilation due to the large cross- section area of the opening. The openings of such stone mines are typically twice or thrice
Feb 1, 2025
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
Selective-Reductive Leaching of Manganese from Low-GradeManganese Ore Using Tannic Acid as Reductant Mining, Metallurgy and ExplorationBy Eti Purwaningsih, Widi Astuti, Erik Prasetyo
Selective-reductive leaching of manganese from low-grade manganese ore using tannic acid as a reductant in acidic media was demonstrated by XRD, SEM-EDX characterization, and batch leaching studies at
-
Biooxidation Of An Auriargentiferous Arsenical Pyrite Concentrate By Means Of Mesophilic And Thermophilic BacteriaBy E. T. Pecina
Bioleaching is a viable option for the processing of auriargentiferous refractory ores with high arsenic content. The application of mesophilic (A. ferrooxidans and ?L. ferrooxidans?) and thermophilic
Jan 1, 2010
-
Preparation Of Fine Coal With The Hydrocyclone - IntroductionBy W. L. Chen
In the United States hydraulic cyclones have been used for thickening, classification and cleaning in coal preparation plants for many years. The cleaning cyclones presently in use are based on using
Jan 1, 1965
-
Reducing Longwall Tailgate Workers' Dust Exposure Utilizing Water-Powered ScrubbersBy John A. Organiscak
The Bureau of Mines evaluated a new dust control technique for longwall personnel required to work at the tailgate end of the face. This technique utilizes a water-powered scrubber to clean a portion
Jan 1, 1983
-
Design Considerations Of A CIL CircuitBy K. Chandrasekaran
Carbon-in-Leach (CIL) is conventionally used in gold processing operations when preg robbing components are present in the ore. CIL process is becoming attractive even in other situations when preg ro
Jan 1, 1991