Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 2574 KB
- Publication Date:
- Dec 1, 2022
Abstract
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to mitigate the risk of flash flooding in the Historic District, including a proposed stormwater conveyance tunnel. Challenges to overcome include thick zones of saprolite along the alignment, multiple near-surface structures, and minimal rock cover under an active railroad, while minimizing impacts to the public and historic structures. The project will also pursue recognition through the ISI Envision verification process.
Citation
APA:
(2022) Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022MLA: Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.