Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 232 KB
- Publication Date:
- Jun 13, 2023
Abstract
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges
which, continuing to develop over time, hampered excavation completion and
impacted the cast-in-place final lining technique and work execution sequence for the
entire project. The continued degradation of the excavated hard rock tunnel conditions
led to a unique, dynamic, geologic setting that forced the project to innovate new and
adaptable measures allowing for a conventional cast-in-place liner to be completed in
a safe and timely manner and minimize delay.