Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
Non-Destructive Testing Of Pile Foundations In India: Current Practices And ChallengesBy Heman Manchanda, Jyoti Agarwal
Several infrastructure projects are under construction in India; many of them involves construction of deep foundations like reinforced concrete and steel piles to support super structures. As most of
Sep 1, 2022
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Harry Nice Bridge Geotechnical Instrumentation Case StudyBy Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.
Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans
Oct 1, 2022
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CABy Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
A System with Local Strain for Studying Shear Modulus Degradation of Cement Treated Clay with FibersBy Min Sunn Ye, Wei Wang, Huawen Xiao, Kai Yao, Fook Hou Lee, Siang Huat Goh
"Previous research have shown that introducing fibers to cement soil mixture is effective in improving the ductility as well as maintaining the strength of cement-treated soil. A good knowledge of sti
Jan 1, 1900
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
New Tacoma Narrows Bridge CaissonsBy R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2013
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway EmbankmentBy Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
Deep Soil Mixing Trials at Porto Alegre Airport, BrazilBy A. Ortigão, M. Felix, E. Falk, T. Koehler
"Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se
Jan 1, 2015