Integrity Testing Of Deep Foundations - SynopsisBy R. T. Stain
Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part
Jan 1, 1987
-
The Settlements Of Buildings On Pile FoundationsBy Mait Mets
In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th
Jan 1, 2002
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6By Daniel Mageau
Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case
Jan 1, 1998
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Foundations For Light Buildings On Lime/Cement (L/C) Columns ? SummaryBy Per Eriksson
For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m
Jan 1, 2000
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
Underpinning With Steel Pipe PilesBy Pasi Korkeakoski
There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and
Jan 1, 2000
-
Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted MicropilesBy Tom Szynakiewicz
Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea
Jan 1, 2008
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
Ladies And Gentlemen,By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Peak And Post-Peak Shear Strength Of Cement-BentoniteBy Paul J. Axtell
Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t
Jan 1, 2010
-
Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - SynopsisBy L. P. Weber
During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for
Jan 1, 1991
-
Wharf Reconstruction At Gasps Sandy Beach - HistoricPort Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi
Jan 1, 1987
-
Innovative Construction Techniques Used At North Shore Construction ProjectBy Kanchan K. Sen
The North Shore Connector (NSC) project will extend the Allegheny County Port Authority?s Light Rail Transit System from downtown Pittsburgh below the Allegheny River to the North Shore via twin bore
Jan 1, 2010