Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Design Methodology for Multi-Facetted, Winged Steel FoundationsBy Phillip E. Glogowski, N. Catherine Bazan-Arias
Steel foundations can be designed to cross-sectional configurations ranging from triangular and square to other multi-side shapes. Adding lateral extensions (hereby called wings) along the length of t
Sep 8, 2021
-
Nearshore Pile Construction Experience In Burnie, TasmaniaBy Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
Correlation between Undrained Shear Strength in Dry Deep Mixing Columns and Unimproved Soft SoilBy Stefan Larsson, Jan Ekström, Jennie Kock-Larsen, Håkan Garin
"This paper describes the testing procedure (or protocols) for quality control of dry deep mixing columns in a major ground improvement project carried out in Sweden. Quality control was mainly based
Jan 1, 2015
-
Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope StabilizationBy Yan Lap J. Kan
"A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high
Jan 1, 2016
-
Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case HistoryBy Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni
"The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe
Jan 1, 2015
-
Adjacent Top-Loaded Bi-Directional Test And Conventional Bidirectional Load Test Results – Site IiBy Patrick J. Hannigan, Seth Robertson, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (―TLBT‖) and the conventional Bi-Directional Load Test (―BDLT‖) are full-scale static load test methods. In both methods, the test loads are applied bi-directionally
Oct 1, 2022
-
Performance Analysis Of Fly Ash Stabilized, Highly Saline Unsaturated Expansive Clays: A Case StudyBy Mohini Patel, Jahnavi Parmar, Pranav R. T Peddinti
Expansive clays pose a variety of geotechnical problems. Although the admixture stabilization is proven to address their problematic swelling and shrinkage characteristics, the influence of unsaturate
May 1, 2022
-
Block 43: Diverse Technologies in Complex Site ConditionsBy John Kvinsland
"The Block 43 Project is the future home of the Paul Allen Institute for Brain Science located just off the southern shore of Lake Union in Seattle, Wash. The South Lake Union (SLU) district experienc
Jan 1, 2014
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific OceanBy Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Static Behavior of Steel H-Piles under Axial Load using Scale Models in Very Soft ClaysBy Francisco A. Flores, Rigoberto Torres
The Complementary Technical Standards of Mexico’s City Building Code do not mention the criteria to compute the bearing capacity of Steel H-piles. It is necessary to increase knowledge in using steel
Sep 8, 2021
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic LoadingBy Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert
The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines
May 1, 2022
-
Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping TrenchBy Chris L. Powell, Russell J. Denny.
"The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co