Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary

    By Per Eriksson

    For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m

    Jan 1, 2000

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Minipiles And Jet-Grouting: A Strong Foundation In Parma, Italy

    By Bruno Gemmi

    The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid

    Jan 1, 2011

  • DFI
    Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction

    By D. Arentsen

    Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin

    Jan 1, 1987

  • DFI
    Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation

    By Jeffrey R. Hill

    To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a

    Jan 1, 2006

  • DFI
    Dynamic Testing Results Indicator Pile Test Program --I-880 - Introduction

    By D. Michael Holloway

    The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-

    Jan 1, 1995

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall

    By Paul J. Sabatini, Yazen A. Khasawneh

    "A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse

    Jan 1, 2017

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • DFI
    Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis

    By G. Price

    The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less

    Jan 1, 2010

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • DFI
    Ladies And Gentlemen,

    By George Koenig

    I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it

    Jan 1, 1987