    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam

    By Jamey Rosen, Georgette Hlepas

    "Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement

    Jan 1, 2016

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Load Tests On Large Diameter Bored Piles In Cemented Sands

    By Nabil F. Ismael

    Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.

  • DFI
    Micropiled Foundations of Telecommunication Towers

    By Racquel Nottingham, Marc Mastrantuono, Freddy Lopez

    In the digital era that we live in, connectivity and mobility play a decisive role in our daily activities. In this context, insufficient telecommunication infrastructure gives origin to the so called

    Sep 8, 2021

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - Introduction

    By Alan Alhadeff

    Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi

    Jan 1, 1990

  • DFI
    Dynamic Behavior Of Pile Foundations

    By Yingcai Han

    The dynamic behavior of pile foundations is investigated in both theory and practice. The computation method for vibration of pile foundations and DYNAN computer program are introduced comprehensively

    Jan 1, 2002

  • DFI
    Experiment to Determine the Influence of Groundwater Level on Grid-Form Deep Mixing Walls for Liquefaction Control

    By Tsuyoshi Honda, Kazuhiro Kaneda, Masayuki Imai, Kazuo Konishi, Kunio Higashinaka

    "In recent years, the demand for measures to control liquefaction of existing airport runways and harbor structures has increased. However, from the perspectives of constructability and cost, applicat

    Jan 1, 2015

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • DFI
    Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process

    By E. W. Raabe

    The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available

    Jan 1, 1989

  • DFI
    Ralston Dam Spillway Stability Over Pierre Shale

    By Gokhan Inci

    Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri

    Jan 1, 2007

  • DFI
    Drilled Pier Foundation In Hard Carbonate Rock ? Synopsis

    By K. E. Darnell

    Drilled pier foundations have long been a favored foundation type for heavily loaded structures. Drilled piers derive their load-bearing capacity from end-bearing, and/or sidewall friction. This type

    Jan 1, 2010

  • DFI
    Application Of Several Soil Improvement Methods In China

    By J. H. Qian

    China is one of the countries with comparatively wide distribution of soft soil. In the wake of the rapid developement in the national economy and construction, the improvement technique of soft soil

    Jan 1, 2010

  • DFI
    Augered Cast-In-Place Pile Load Tests On The Cincinnati, Ohio/Northern Kentucky Riverfront

    By Theodore W. Vogelpohl

    Augered cast-in-place piles have proven to be effective, adaptable and economical for projects throughout the Ohio River Valley. Specifically, they have been used extensively for high-rise structures,

    Jan 1, 2005

  • DFI
    North American Geotechnical Exploration Practice ? Synopsis

    By C. O. Riggs

    Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a

    Jan 1, 2010

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    Construction-Induced Vibrations And Green Concrete: Literature Review And Case History

    By William M. Camp

    Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s

    Jan 1, 2010

  • DFI
    Instrumented Static Load Testing-Auger Cast-In-Place Piles - Introduction And Purpose

    By Michael T. Lambert

    The purpose of the this paper is to demonstrate the benefits of using additional instrumentation during load tests of auger-cast-in-place piles. Traditionally, only load and butt displacement are dete

    Jan 1, 2000

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003