    Field Application of Destructive Wave Interference

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Scott Crabtree, Randy Wheeler

    Theoretical description of destructive wave interference and the use of sacrifi cial holes is included and is supported by data collected at Springfi eld Underground. Finally, the process by which the

    Jan 1, 2008

  • ISEE
    The Use of Computer Based Blasting Models in Mine Feasibility Analyses (d77e0f44-d5f8-4a76-8875-d772b7b19692)

    By George Boucher, Simon Williams, Neil McBride

    "The aim of these analyses was to utilise the latest available production information for the Wandoooperation to determine the optimal blasting parameters, costing’information and predicted results(fr

    Jan 1, 1998

  • ISEE
    Underwater Explosions: Effect of Boosters Shape to its Ability to Igninte Insensitive Plastic Bonded Explosives (IM - PBX)

    By Martti Hagfors

    The Finnish Defence Forces Technical Research Centre (PVTT) studied the effect of shape of boost-er to its ability to ignite insensitive (IM) plastic bonded explosive (PBX). Therefore an explosive fac

    Jan 1, 2013

  • ISEE
    Six Pillars, Inventory Management & ATF Record-keeping

    By Ron Ketterling

    Donna Summer wrote and recorded a song in 1983 with Michael Omartian called, “She Works Hard for the Money.” The song was inspired by her encounter with an exhausted rest room attendant, Onetta Johnso

  • ISEE
    Economics of Blasting around Steep Dipping Coal Seams at the Mt. Owen Mine

    By Trevor Howie, Mal Edwards

    "Thiess Contractors Pty Ltd. designed and operate the Mt Owen Mine in the Hunter Valley of NewSouth Wales, Australia on behalf of the owners of the mine, BHP Coal Pty Ltd. The mine is a multiseam open

    Jan 1, 1997

  • ISEE
    Probable Causes of Explosives System Malfunction in Blasting

    By B Mohanty, G Yamin

    A number of parameters, aside from blast design and pre-existing rock conditions, can change the performance of the explosives system in actual blasting practice. Sympathetic pressures caused by deton

    Jan 1, 2005

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • ISEE
    Analytical High-Speed Photography to Evaluate Air Decks, Stemming Retention and Gas Confinement in Presplitting, Reclamation and Gross Notion Applications

    By Mark E. Hammele

    A number of new thoughts have recently emerged concerning the role of air decks, stemming, gas confinement and gross motion in specific blasting environments and applications. Field research in full-s

    Jan 1, 1989

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • ISEE
    Using Explosive Risk Assessment Tools for Emergency Operations Planning

    By Dean Nichols, Matt Ortel

    Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly

    Jan 1, 2016

  • ISEE
    Tunnel Excavation on the Abutment of an Existing Dam

    To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint

    Jan 1, 2016

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • ISEE
    Measuring Underground Face Drilling and Blasting

    By Thomas Barkley

    Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure

    Jan 1, 2003

  • ISEE
    Modified Case Charge for Avalanche Control

    By Eduardo Lozano, Vilem Petr

    This paper provides an overview of a new method for avalanche control using a high explosive charge placed at the avalanche runout zone: the case charge technique. This new avalanche control technique

    Jan 1, 2018

  • ISEE
    Study of Blasting Produced Air Overpressure in Urban Area

    By Zou Dingxiang

    Rock blasting in the project of “Site Formation and Associated Infrastructure Works at Choi Wan Road and Jordan Valley” is the largest urban blasting project in the history of Hong Kong and also is ra

    Jan 1, 2007

  • ISEE
    The Evaluation of Explosives Performance: an End Users Point of View

    By N T. Moxon, L W. Armstrong

    Explosive manufacturers have for many years provided a service to the mining industry which has,until recently, been unchallenged by mine operators. Today mine operators are more aware of the properti

    Jan 1, 1991

  • ISEE
    PECCS – Pan-European Competence Certificate for Shot-Firers/Blast Designers

    By Teele Tuuna, Voglers Eesti OÜ

    Blasting operations are a strong and important part in any kind of building and mining industry, a shot-firer profession is one of the oldest professions in the civilized world. It still serves an imp

    Jan 1, 2018

  • ISEE
    Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures

    By Mike Cammack, Logan Huppert, Gustavo Azpilcueta

    During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin

    Jan 1, 2018

  • ISEE
    Improvements in Quarry Blasting Cost Effectiveness

    By P Cotton, N Cox

    The Brisbane City Council has implemented a program of continual improvement at its Mount Coottha Quarry in the heart of Brisbane, Australia. The program has been underway for the past 6 years, and ha

    Jan 1, 1996

  • ISEE
    Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power Station

    By N. Jayaraman, V. Srikant, A. Radhakrishna

    Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra

    Jan 1, 2003