Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.

    Jan 1, 1996

  • SME-ICGCM
    Mine-Wide Monitoring Applications In Ground Control Research

    By David Conover

    Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f

    Jan 1, 1990

  • SME-ICGCM
    Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems

    By John D. VandeKraats

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling

    Jan 1, 1996

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Material Instability Hazards In Mine Processing Operations

    By John W. Fredland

    Many accidents occur in the mining industry as a result of the instability of material during handling and processing operations. Accidents due to dump point instability at stockpiles, and at spoil or

    Jan 1, 1993

  • SME-ICGCM
    Application Of Physical And Mathematical Modelling In Underground Excavations

    The scope of this paper is to introduce a mathematical model based on matrix algebra in order to determine similitude quantities, which can be arranged in specific formats to simulate the field condit

    Jan 1, 1989

  • SME-ICGCM
    Birth Of A Longwall-Initial Planning To Post-Subsidence Mitigation

    By E. D. Doney

    The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort

    Jan 1, 1990

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Support selection of mine roadways by means of a computer program

    By Erdal Ünal

    The computer program introduced in this paper is based on design guidelines developed for selection of support systems used in mine roadways. The support types considered include rock bolts as well as

    Jan 1, 1989

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009