Abstract
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development process of determining the proper configuration is challenging, and a major economical consideration. Greenbrier Smokeless Minerals engineering staff and consultants, along with DSI/American Commercial, developed a support configuration that was best suited for their slope. The developmental process took into consideration the length of slope, depth of slope at the high-wall transition, economics of a single or multiple entries, waterproofing, stresses on the steel supports and lagging during the backfilling operation. This paper describes the developmental concept of using a single entry, side by side configuration, using steel ?Banjo String? supports with steel plank lagging, to develop a long term permanent installation in a cut and cover application.
Citation
APA:
(2009) Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)MLA: Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be). International Conference on Ground Control in Mining, 2009.