Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Rigid Inclusions For Soil Improvement In A 76 Building Complex

    By Walter I. Paniagua

    A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl

    Jan 1, 2008

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    History Of Chicago Foundation Systems & Underground Construction ? Summary

    By Theodore R. Maynard

    The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to

    Jan 1, 1991

  • DFI
    Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method

    By George Piscsalko

    "Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to

    Jan 1, 2014

  • DFI
    Development of Site-Specific Acceleration Response Spectra fora Liquefiable Bridge Site

    By S. Ali Bastani, Ashley Varni

    Design acceleration response spectra (ARS) are directly correlated with dynamic forces and estimated dynamic bridge displacements, which make them a critical aspect of dynamic bridge design. Nonlinear

    Jan 1, 2018

  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)

    By W. G. K. Fleming

    The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and

    Jan 1, 1999

  • DFI
    Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts

    By Jorge Beim

    Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci

    Jan 1, 2012

  • DFI
    Deterministic Analysis for Liquefaction and its Mitigation by Suitable Foundation Type in Bangladesh

    By Arpit Parikh

    "Ground Water or Pore water pressure development in Sandy Soil formation is Critical situation in foundation analysis and design.Moreover it become severe while associated with higher liquefaction pro

    Jan 1, 2017

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    Driven Piles For New Pacific Northwest Baseball Park - Introduction

    By Thomas M. Gurtowski

    The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th

    Jan 1, 1998

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • DFI
    Technical Visit

    By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST

    Jan 1, 1994