The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig. 1). The Boat Section is approximately 900 feet long and varies in width from about 135 to 185 feet (Fig. 2). The depth to the top of the Boat Section base slab varies from about 28 to 31 feet below final ground surface and about 23 to 26 feet below normal ground water levels. The Boat Section is supported on 578 anchors drilled into the underlying bedrock each designed for a working load of 630 kips. Design and Construction Team The owner of the project is the Massachusetts Highway Department (MHD). The owner's representative is the Management Consultant, Bechtel/Parsons Brinckerhoff. The section design consultant (SDC) consisted of HDR Engineering, Inc. with GEI Consultants, Inc. as the geotechnical subconsultant. The general contractor was the joint venture of Kiewit, Perini, Atkinson, and Cashman. The boat anchors were installed by the subcontractor Delta Geotechnical Services, Inc.
Citation

APA: Kenneth Pidgeon  (1994)  Design Of The BMIP Boat Section - Introduction

MLA: Kenneth Pidgeon Design Of The BMIP Boat Section - Introduction. Deep Foundations Institute, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account