Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes

    By Arash Khosravifar

    The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).

    Jan 1, 2010

  • DFI
    Construction Of Deep Foundations By Cast-In - Borehole Method

    By Y. W. Mou

    In order to improve the construction of pile foundations and deep foundations of largo sizes, the paper deals with the method of installing square or rectangular bored-piles for annular foundation as

    Jan 1, 2010

  • DFI
    Pier Design And Construction In Water Bearing Soils ? Synopsis

    By C. N. Baker

    The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig

    Jan 1, 2010

  • DFI
    Safe Load Of A Single Pile In Earthquake Loading - Synopsis

    By Shamsher Prakash

    Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t

    Jan 1, 1996

  • DFI
    Settlement Control Of A Road Embankment Using Vertical Drains

    By Wei Tu

    A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that

    Jan 1, 2009

  • DFI
    I Don't Have X-ray Vision: Risk-Informed Site Investigation

    By Georgette Hlepas

    How often phrases like these have been made by project managers and project teams trying to explain why there has been cost growth, project delays and differing site conditions claims. But does it re

    May 1, 2022

  • DFI
    Mindful Monitoring Of A Variable Excavation Support System

    By B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior

    A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req

  • DFI
    Self-Drilling Micropiles

    By Matt Sotirin

    The Santa Fe train station and passenger rail platform were constructed in the downtown district of Fort Madison, Iowa, over a century ago. This landmark building and rail platform were in need of maj

    Oct 1, 2022

  • DFI
    The Realities Of Resolving Conflicts During Construction ? Synopsis

    By J. S. Ward

    In a well-written set of contract documents, the probability of conflicts arising during the course of construction is minimized. However, no matter how complete may be the technical language in the c

    Jan 1, 2010

  • DFI
    Current Pile Driving Practices In The United States

    By Alan G. MacKinnon

    The current piling practices in the U. S. have, to a great degree, been influenced by our founding fathers. When our constitution was written by the delegates from the original thirteen colonies, it w

    Jan 1, 1987

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1998