Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    La détermination des EGP dans les roches: revue des techniques analytiques basées sur I'utilisation de la fusion plombeuse et de la fusion au sulfure de nickel

    By Mario Bergeron

    L'exploration géologique pour les EOP (EOP: platine, palladium, iridium, osmium, ruthénium, rhodium) requiert avant tout des méthodes appropriees à la mesure de ces élémenIs. L'approche anal

    Jan 1, 1990

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    Coal Mining and Geology in Canada

    By F. W. Gray

    Summarized Foreword This paper is one of a series arranged by Institute Divisional Committees for the Fiftieth Anniversary Meeting, reviewing the experience of the major mining and metallurgical in

    Jan 1, 1948

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Radiation Grafted Structures - A New Tool for Recovery of Precious Metals from Dilute Solutions

    By G. Shore

    Radiation grafted structures my be fabricated to contain ion exchange groups selective to an ion complex. Proper choice of substrate and monomer will provide selective ion exchange with differing phys

    Jan 1, 1985

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Behaviour of Reinforced Ribs of Shotcrete (RRS) Under Changing Load

    By P. Chryssanthakis

    "The aim of this study is to give a better understanding for the behaviour of the composite material RRS and the synergy effect of its components while an excavation face advances during tunneling. Th

    Jan 1, 2015

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Improved Iron Recovery at QCM Pellet Plant

    By Guy Chevalier

    The QCM Mount-Wright mine and concentrator complex produces about 14 M tonnes of iron concentrate annually. Approximately 9.5 M tonnes of this concentrate are used to produce iron ore pellets at four

    May 1, 2007

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Improved flow-through share rules

    By Robert B. Parsons

    "Canada's mining industry has reason to celebrate the federal government's budget which was tabled on February 26, 1986. The budget contains an important proposal to improve the flowthrough

    Jan 1, 1986

  • CIM
    The Development of the Sullivan Mine and Processes for the Treatment of its Ores

    By Staff

    This paper contains an outline of the history of the Sullivan mine, now owned and operated by the Consolidated Mining & Smelting Company of Canada, Ltd.; some account of the various methods by which t

    Jan 1, 1924

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc Ores

    By D. M. Wyslouzil

    "This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment

    Jan 1, 1984

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981