Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Influence of Pile Geometry on the Dynamic Response of an Under-Reamed Pile
By M Muzammil, S. Mukerjee, S. Saran, M. Bharathi
"This paper presents the results of in-situ tests conducted on a set of under-reamed piles in a silty sand deposit. Three piles (i.e. vertical, vertical with one bulb and vertical with two bulbs) of d
Jan 1, 2015
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site Characterization
By Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam
By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Experimental Evaluation of Building Settlements Founded on Liquefiable Soils
By Ramin Motamed, Farshid Ghazavi, Joseph A. W. Toth
"Post-disaster reconnaissance of areas affected by earthquakes has documented extensive damage to buildings with shallow foundations located in liquefaction-prone areas. Currently, estimation of lique
Jan 1, 2016
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage Tanks
By Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Deep Mixing Core Data from LPV 111
By Donald Bruce, Alex Reeb, George Filz, Wesley Schmutzler, Mitsuo Nozu
"One million seven-hundred thousand cubic yards of deep mixing were installed to support an elevation raise of an earthen levee known as LPV 111, which is located in east New Orleans. The deep mixing
Jan 1, 2015
-
Seismic Remediation of Perris Dam
By Michael W. Driller, Wen Yan (Grace) Chen, Steven J. Friesen
"Remediation for Perris Dam has been proposed in response to deficiencies identified in a seismic stability study prepared by the California Department of Water Resources (DWR) in 2005. Lenses of pote
Jan 1, 2015
-
Allowable Compressive Design Stresses For Pressure-Treated Round Timber Foundation Piling - Presented Before The American Wood-Preservers' Association Reno, Nevada, May 1985
By James S. Graham
Research at the University of Colorado on southern pine and Douglas-fir piling has determined that the existing building code design stress values of 1200 psi and 1250 psi, as determined by ASTM D-289
Jan 1, 1986
-
Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead Wall
By WenJun Dong
This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st
Sep 8, 2021
-
Verification Of Drilled Shaft Resistance By The Post Grouting Method
By Suthan Pooranampillai
Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c
Jan 1, 2010
-
The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts
By Steven M. Henderson, Zachary D. Jones
The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on
Jan 1, 2017
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel
By Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022
-
Workshop on Quality Assurance for Post-Grouted Drilled Shafts
By Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts
By Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, Canada
By Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, Switzerland
By Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England
Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f
May 1, 2022
-
Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents
By Frank Rausche
Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world
Jan 1, 2001
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris Project
By Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Newtown Creek Pile Foundation Work 2009
By Thomas Trochalides
Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity
Jan 1, 2010