Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Operation Control of Flash Furnace at Saganoseki Smelter & Refinery

    By H. Hirayama, T. Okura, O. Kato

    "Saganoseki Smelter & Refinery, one of the largest copper smelters in the world, has the annual capacity of 300,000 metric tons in copper content with two flash furnaces, six Pierce-Smith type convert

    Jan 1, 1989

  • TMS
    Behavior of Coal-Based Direct Reduction Reaction of Iron Oxide Pellets by Microwave Heating

    By Bing Hu, Zhu-Cheng Huang, Guang-Bin Xia, Hu Peng, Hua Wang

    "The temperature rising characteristics and reaction of the reduction of iron oxide pellets with anthracite fines were studied using a MW-L0316V microwave oven and Leica-DM-RXP polarizing microscope.

    Jan 1, 2011

  • TMS
    Gas-Solid Reaction Will Help Solid-Solid Reaction ? Novel Iron Ore Agglomerate Bearing Semi-Coal-Char

    By Tateo Usui

    In the course of carbonization of coal under a rising temperature condition, volatile matter (V.M.) is released. The kind and amount of V.M. released depend on the kind of coal. Components of V.M. a

    Jan 1, 2006

  • TMS
    He Cooling Of ,Hot, Dirty, Corrosive, Non-Ferrous Smelter Gase5 With Particular Reference To Waste Heat Boilers

    By W. Drummond

    The cooling of smelter gases by air dilution, adiabatic evaporative cooling and indirect heat exchange is discussed with reference to the ,process, to the subsequent cleaning of the gas and to the use

    Jan 1, 1992

  • TMS
    The Solubility of Metal Phosphates

    By R. G. Robins

    Metal separations based on the selective precipitation of phosphates have a potential application in many hydrometallurgical processes. This paper reviews the literature on the solubility of a number

    Jan 1, 1991

  • TMS
    1999 Rebuild Of The BHP San Manuel Outokumpu Flash Furnace

    By D. M. Jones

    In May 1999 the first campaign of the BHP San Manuel flash smelting furnace (FSF) will be concluded after having set world records for both campaign length and tonnage smelted for an Outokumpu copper

    Jan 1, 1999

  • TMS
    Carbothermic Reduction of Nickel-Cobalt-Chromium Oxide Mixture for the Production of NiCoCr Superalloy Powder

    By Eoghan T. M Doyle

    Oxide mixtures of nickel (NiO), cobalt (COO) and chromium (Cr203) were prepared with graphite in stoichiometric amounts and the powder mixtures were compacted to produce cylindrical pellets. The compo

    Jan 1, 1992

  • TMS
    The Evaluation of Foaming Behaviour of Surfactants for Acid Mist Control in Metal Electrolysis Processes

    By A. M. Alfantazi, M. Boissoneault, D. B. Dreisinger, J. Synnott

    Acid mist generation is a major concern in zinc, copper and nickel electrowinning industries and there is a strong environmental drive to control its emission into the work environment. Foaming reagen

    Jan 1, 1997

  • TMS
    Teniente Converter Slag Cleaning In An Electric Furnace At The Las Ventanas Smelter

    By Ricardo Ponce

    In recent years, ENAMI implemented modernisation plans at its two smelters in order to meet the government's environmental regulations introduced in the early 1990s. The modernisation plans defin

    Jan 1, 1999

  • TMS
    Technology Necessary to Develop a Truly Automated Manufacturing Facility

    By W. F. Ranson, R. C. Progelhof

    "I. THE PROBLEM: MANUFACTURING PRODUCTIVITYThe 1985 President's Commission [I] on Industrial Competitiveness found compelling evidence of the declining economic position of the United States in world

    Jan 1, 1988

  • TMS
    Recent Operation of Acid Plant at Sumitomo Toyo Smelter

    By Kenichi Moriyama

    The Sumitomo Toyo Copper Smelter started operation in 1971, as an epoch-making smelter at which 9996 of the charged sulfur could be captured. In the past ten years, the amount of treated copper concen

    Jan 1, 1995

  • TMS
    Origin of the Orphan Mine Breccia Pipe Uranium Deposit, Grand Canyon, Arizona.

    By V. Gornitz

    The Orphan mine uranium deposit, Grand Canyon, Arizona, is a cylindrical collapse-breccia pipe, 70 to 150 m in diameter and 500 m deep. Pipe fill was derived from the Supai Group, Hermit Shale, and th

    Jan 1, 1987

  • TMS
    Characteristics and Non-Isothermal Crystallization Kinetics of Spinels in Vanadium Slag Containing High Content of Chromium

    By Hai-Xing Fang, Chao Liu, Tao Zhang, Bing Xie, Hong-Yi Li, Cui Li

    "Hongge Ore, a kind of vanadium-titanium magnetite ore containing high content of chromium, is valuable resource for extracting Fe, V and Cr in China. During present processing of the ore, vanadium an

    Jan 1, 2013

  • TMS
    Strength and Ductility of Ultrafine Grained 304ss Prepared By Accumulative Rolling and Annealing

    By D. F. Liub, Z. Y. Liu, W. Y. Xue, Y. F. Shenb, Y. D. Wang

    "The microstructure characteristics and deformation behavior of ultrafme grained (UFO) 304SS fabricated by accumulative rolling and armealing have been investigated by means of tensile tests, electron

    Jan 1, 2013

  • TMS
    A Comparison between the Properties of SnO2:F Thin Films Prepared by using Different Doping Compounds: HF and NH4F

    By Shadia J. Ikhmayies

    "Nanocrystalline fluorine doped tin oxide (Sn02:F) thin films were produced by the spray pyrolysis technique (SP) on glass substrates at a substrate temperature T, = 450 ° C. The hydrated stannous chl

    Jan 1, 2013

  • TMS
    Removal of Toxic Metals from Dilute Effluents by Ion Flotation

    By Kandipati Sreenivasarao

    Ion flotation is a promising separation process for continuously removing toxic metal ions from dilute process effluents. After treating the effluent with appropriate surfactant(s), the metal- bearing

    Jan 1, 1993

  • TMS
    Pollution to Power: A Case Study Of The Kennecott Sulfuric Acid Plant

    By Steven M. Puricelli

    Sulfuric acid plants associated with smelters, have historically been an overworked and often neglected pollution control device. They could do little more than manage the wide fluctuations in gas flo

    Jan 1, 1998

  • TMS
    Assessment Of The Performance Of The Tundish Of A Six Strand Continuous Casting Unit Of Companhia Siderurgica Belgo-Mineira (CSBM), Brazil Using Physical Modeling

    By Mônica Suede Santos Silva

    This work describes characterization of the performance of the tundish of a six strand continuous casting unit of the Companhia Siderúrgica Belgo Mineira, João Monlevade, Brazil using physical modelin

    Jan 1, 2003

  • TMS
    High-Performing Flash Smelting Furnace at Saganoseki Smelter & Refinery

    By Takayoshi Fujii, Mitsumasa Hoshi, Chikashi Suenaga, Yoshiaki Suzuki

    "In a bid to renovate its Saganoseki Smelter & Refinery and to establish a leading production unit in terms of global competitiveness, Nippon Mining & Metals undertook major - restructuring efforts si

    Jan 1, 2000

  • TMS
    Process Improvements At The Phelps Dodge Chino Smelter

    By M. J. King

    The Chino Smelter embarked on a program to reduce smelter emissions. Fugitive sulfur dioxide and particulate emissions were reduced by (i) removing the flash furnace settling chamber and (ii) installi

    Jan 1, 1998