Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME-ICGCM
    Chemical Destressing to Alleviate Rockbursts

    By S. P. Singh

    Destress blasting is commonly used in the mines to minimize the occurrence of rockbursts. The fracturing created by destressing in the vicinity of the face reduces the stress concentration by pushing

    Jan 1, 1987

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    Roof Bolting Application In Longwall Mining In Indonesia And Japan

    By Herryal Anwar

    The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that

    Jan 1, 1999

  • SME-ICGCM
    Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface Structures

    By Yi You

    A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term

    Jan 1, 1997

  • SME-ICGCM
    Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M

    By Klaus Opolony

    The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p

    Jan 1, 2002

  • SME-ICGCM
    Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock Bolts

    By Clare Offner

    In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r

    Jan 1, 2000

  • SME-ICGCM
    Variation In The Load Transfer Of Fully Encapsulated Rockbolts

    By Paul Hagan

    A diverse range of rockbolt designs and resin anchors are available for use in underground mines. Despite their wide spread use, the factors that affect the performance a rockbolt is not fully underst

    Jan 1, 2004

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    Measurement of Effects of Interaction and Influence on Mine Layout Design at Maltby Colliery

    By J. S. Oram

    Maltby Colliery, operated by RJB Mining (UK) Ltd is successfully mining the Parkgate seam in Yorkshire at a depth of 1000m using longwall retreat. Extraction in the Parkgate seam is influenced by inte

    Jan 1, 1997

  • SME-ICGCM
    Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope Entries

    By John Stankus

    Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans

    Jan 1, 2011

  • SME-ICGCM
    Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)

    By Wei Wu

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri

    Jan 1, 1992

  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    Review of Evaluation and Design of Secondary Support Performance in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Quantitative evaluation of secondary support performance in longwall tailgates in U.S. coal mines was introduced with the U.S. Bureau of Mines (USBM) Wood Crib Performance Model. This model evaluated

    Jan 1, 2018

  • SME-ICGCM
    Resin Annulus Size Effects On Rebar Bolt Pull Strength And Resin Loss To Fractured Rock

    By Al Campoli

    One of the critical variables affecting resin bolt performance is the size of the resin annulus, defined as the difference between the hole and bolt radius. The vast majority of the millions of resin

    Jan 1, 1999

  • SME-ICGCM
    Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt System

    By John D. VandeKraats

    Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su

    Jan 1, 1998

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Analysis Of The Seam Inclination Effect On Roof Stability

    By Hanjie Chen

    Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a

    Jan 1, 2000

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997