Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting
Jan 1, 2001
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
The Lateritic Regolith in Arid Terrains: Description, Formation, Evolution: Consequences for Geochemical ExplorationThe weathering profile, in arid terrains, is commonly capped by different kinds of hardened crust, whose formation is related to recent or former climates. One may distinguish silcretes, calcretes
Jan 1, 1988
-
Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold ArmeniaBy D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane
The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The
Aug 29, 2018
-
DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First PrinciplesBy P Vass, C Butler, J Condon, B Hooper
DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing
Sep 29, 2013
-
Controlling Blast Related Fumes with Unconventional ExplosivesBy J Rock, K Bambrook
"Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th
Nov 15, 2016
-
Investigations for Proposed Upgrade of the Homer Tunnel, New ZealandBy A D. Campbell
The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a
Mar 8, 2011
-
Dissolution of quartz in Mn-slags during production of SiMn alloyBy S Jayakumari, E Ringdalen, V Canaguier
Silicomanganese (SiMn), containing approximately 16–30 per cent Si, is produced in submerged arc furnaces using various Mn sources and quartz as the primary raw materials, along with fluxes and reduct
Jun 19, 2024
-
Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case StudyBy D Kentwell
For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e
Jul 13, 2015
-
Rolling Mills finishing Processes AnalysisBy Atalla YM
Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)
Jan 1, 1975
-
Keeping up with the Joneses – the value of industry surveys and benchmarkingBy T D. H McGrath, W P. Staunton
Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to
Aug 29, 2018
-
Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case StudyBy A Campbell
Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en
Nov 8, 2011
-
The Elimination of Nickel from Zinc Plant Solutions Using DimethylglyoximeBy Kershaw M. G, Maughan R. C A
A process for eliminating nickel from electrolytic zinc plant solutions by precipita- tion with dimethylglyoxime (DMG) was developed to enable the Electrolytic Zinc Company of Australasia Limited (
Jan 1, 1977
-
The Network Centric MineBy G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly
To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T
Nov 20, 2012
-
Geoscience 2033 – a vision for mineral exploration in ten yearsBy C Itotoh, K O’Halloran, L Karlson
Global methods used to explore for minerals have progressed relatively slowly since the development of the first diamond core drill in 1863. Since then, key developments such as wireline geophysics (1
Sep 18, 2023
-
Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald RiverBy J Player, R de Vries, J F. Carswell, R Hassell
"The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development
Oct 16, 2017
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
An Approach to Optimising Coal Mine Design for Sustainable DevelopmentBy M E. Karmis
Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh
Jan 1, 2009