Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    The Lateritic Regolith in Arid Terrains: Description, Formation, Evolution: Consequences for Geochemical Exploration

    The weathering profile, in arid terrains, is commonly capped by different kinds of hardened crust, whose formation is related to recent or former climates. One may distinguish silcretes, calcretes

    Jan 1, 1988

  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    Dissolution of quartz in Mn-slags during production of SiMn alloy

    By S Jayakumari, E Ringdalen, V Canaguier

    Silicomanganese (SiMn), containing approximately 16–30 per cent Si, is produced in submerged arc furnaces using various Mn sources and quartz as the primary raw materials, along with fluxes and reduct

    Jun 19, 2024

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    The Elimination of Nickel from Zinc Plant Solutions Using Dimethylglyoxime

    By Kershaw M. G, Maughan R. C A

    A process for eliminating nickel from electrolytic zinc plant solutions by precipita- tion with dimethylglyoxime (DMG) was developed to enable the Electrolytic Zinc Company of Australasia Limited (

    Jan 1, 1977

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    Geoscience 2033 – a vision for mineral exploration in ten years

    By C Itotoh, K O’Halloran, L Karlson

    Global methods used to explore for minerals have progressed relatively slowly since the development of the first diamond core drill in 1863. Since then, key developments such as wireline geophysics (1

    Sep 18, 2023

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009