Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Safety is all around – state-of-the-art underground mining safety with Mobilaris Mining Intelligence

    By A Prill

    Safety First and zero accidents are the targets most mines in Australia are aiming for, but manual processes and procedures limit the capabilities and response time in emergency situations. Even with

    May 5, 2022

  • AUSIMM
    The Lateritic Regolith in Arid Terrains: Description, Formation, Evolution: Consequences for Geochemical Exploration

    The weathering profile, in arid terrains, is commonly capped by different kinds of hardened crust, whose formation is related to recent or former climates. One may distinguish silcretes, calcretes

    Jan 1, 1988

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    Particle Size Distribution Effects that Should be Considered when Performing Flotation Geometallurgical Testing

    By K C. Runge, E Tabosa, A Jankovic

    Flotation recovery in geometallurgical modelling is usually predicted based on relationships developed from batch flotation testing of different ore types. These batch flotation tests are usually perf

    Sep 29, 2013

  • AUSIMM
    Dissolution of quartz in Mn-slags during production of SiMn alloy

    By S Jayakumari, E Ringdalen, V Canaguier

    Silicomanganese (SiMn), containing approximately 16–30 per cent Si, is produced in submerged arc furnaces using various Mn sources and quartz as the primary raw materials, along with fluxes and reduct

    Jun 19, 2024

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

    By A D. Campbell

    The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a

    Mar 8, 2011

  • AUSIMM
    Backfill Technology Development at Xstrata Mount Isa Mines Between 1995 and 2005

    By L Neindorf

    The development and application of paste fill, cement slurry aggregate fill and shotcrete bulkheads at Mount Isa Mines is described. The progressive changes in filling style in the Mount Isa copper mi

    Jan 1, 2005

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Life-of-mine Planning Tools for a Changing Climate – Intuitive, Interrogative, Iterative

    By M Grigorescu, S Crimp, J H. Hodgkinson, P Kokic, W Jin

    Mines are typically located in remote, inhospitable locations and movement of materials between site, processor and port are often at risk from extreme weather events. Mining companies have recorded m

    Jun 28, 2016

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002