Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Business Transformation - Lessons Learnt for Successful Change

    By G Campbell-Cowan

    Much has been written about the fact that most transformation efforts disappoint. This paper addresses factors that should be taken into consideration in planning and implementing transformation progr

    Nov 20, 2012

  • AUSIMM
    Introduction of and Experience Gained with Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia

    By E M. Jones

    On 26 June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19 000 m3 of saturated hydraulic fill into the

    Jan 1, 2008

  • AUSIMM
    New tools for ground control in freeze shaft sinking

    By J Franz, S Bock, N Hentrich

    Artificial ground freezing is the unrivalled method for groundwater control during mine shaft sinking. Moreover, ground freezing may also provide temporary ground support. The fast development of fibr

    Nov 30, 2018

  • AUSIMM
    Educating the next generation of geologists

    By D R. Cohen

    As one of the four basic sciences, the study of geology is intrinsically worthy as a means of increasing fundamental knowledge of the behaviour and evolution of the universe. Geological knowledge can

    Sep 20, 2017

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • AUSIMM
    A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal Powerplants

    By K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma

    The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s

    Jul 29, 2014

  • AUSIMM
    Economically Mineable Resource in an Underground Metalliferous Mine

    By Bell I. F

    In 1985, ZC Mines (now Pasminco South) had been unprofitable for some years due to a combination of high operating costs, low metal prices, low head grade and an aging and inadequate mining infrastr

    Jan 1, 1992

  • AUSIMM
    Assessment of the Impact of Non-Additivity in the Estimation of Iron Ore Attributes

    By A J. Cornah

    Critical decisions in iron ore project evaluation and production are based on global and local spatial estimates of primary mineral deposit properties (such as in situ geochemical grades) and geometal

    Aug 12, 2013

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    The Frieda Kiss – Keeping It Simple

    By S J. Tear, L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Frieda River Project is located in the north-west of Papua New Guinea. The target commo

    Mar 18, 2015

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    Slag volume effects on direct-reduced iron (DRI)-based electric furnace steelmaking

    By Q Zhuo, P C. Pistorius, M N. Al-Harbi

    A likely increasingly important pathway for future low-carbon ironmaking and steelmaking is the combination of gas-based direct reduction with electric furnace steelmaking (DRI-EAF route), or with ele

    Aug 21, 2024

  • AUSIMM
    Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System

    By J Knoblauch, D, P J. J Strobos, C Foggo

    The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding

    Jan 1, 2006

  • AUSIMM
    Water Conservation at Construction Projects

    By B Hannah, M Uriarte, F Labarca, C Madore, G Ganapathi, L Martin, T Haase

    BechtelÆs Mining and Metals projects across the globe are executed in remote arid and semi-arid countries where providing even basic water supplies impose considerable challenges. Opportunities for wa

    Nov 26, 2013

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    The Development of ‘Radial-in-Reef’ Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania

    By R Goddard

    An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as ‘Radial-in-Reef’ (RiR) stoping, the method employs the drill

    Mar 21, 2011

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    Rehabilitation of the Collapsed Panel 1K North in the Deep Ore Zone Block Cave Mine

    By A Kurniawan, A Sjadat and M Akhasyah

    PT Freeport Indonesia’s Deep Ore Zone (DOZ) is a block cave mining operation that has been in production for 15 years. DOZ is located approximately 900 m below surface and has an average production ra

    May 9, 2016

  • AUSIMM
    The Sealing , Re-Opening, and Recovery of Aberdare North Colliery, N.S.W., Following the Occurrence of a Spontaneous Heating

    By Sneddon N

    In November, 1975, Aberdare North colliery was sealed at the surface to extinguish an open fire underground.The fire had developed from a spontaneous heating in one of the open goaf areas of the mine.

    Jan 1, 1978

  • AUSIMM
    From Face to Surface – a Fragmentation Study

    By A Gustafson, D Johansson, K Jonsson

    The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl

    May 9, 2016