The Frieda Kiss – Keeping It Simple

The Australasian Institute of Mining and Metallurgy
L D. Queen S J. Tear
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
2008 KB
Publication Date:
Mar 18, 2015

Abstract

"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Frieda River Project is located in the north-west of Papua New Guinea. The target commodities for a bulk mining operation are copper and gold associated with a large felsic porphyry system. The project comprises a series of deposits, with the Horse-Ivaal-Trukai (HIT) being the largest. It also includes the adjacent smaller Koki and Ekwai deposits.Previous resource estimates for the HIT were made using 14 separate mineralised domains based on structure, copper grades, lithology and alteration. H&S Consultants (H&SC) has revisited the deposit and concluded that a simpler methodology could be used for resource estimation without using wireframes as hard domain boundaries. This conclusion is based on reviewing all the available geological data combined with geological and resource experience of porphyry deposits.It is generally acknowledged that porphyry deposits form by diffusion of mineralising fluids through the host lithologies, meaning that sharp boundaries are unlikely unless these fluids encounter specific physical or chemical boundaries. It is important to prepare a comprehensive geological model prior to attempting resource estimation as it forms the framework for the estimates; however, not all geological features may be relevant to the distribution of mineralisation and there can be a tendency to overcomplicate the estimation process by using too many domains. Unless a hard boundary can be identified consistently and unequivocally, it is generally better not to use a boundary in that location.H&SC completed unconstrained models with no top-cutting using both a simple flat search ellipse and a steep search ellipse to generate global resource estimates reported within a predetermined pit shell at a 0.2 per cent copper cut-off. Both outcomes are within 10 per cent for the tonnes, contained copper tonnes and gold ounces compared to the constrained resource estimate. The slight differences are most likely due to the different search strategies, but also indicate the robustness of the unconstrained modelling approach.CITATION:Queen, L D and Tear, S J, 2015. The Frieda kiss – keeping it simple , in Proceedings PACRIM 2015 Congress, pp 361–368 (The Australasian Institute of Mining and Metallurgy: Melbourne)."
Citation

APA: L D. Queen S J. Tear  (2015)  The Frieda Kiss – Keeping It Simple

MLA: L D. Queen S J. Tear The Frieda Kiss – Keeping It Simple. The Australasian Institute of Mining and Metallurgy, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account